Summary
The Project consists of removing six flood prone homes and includes, but is not limited to: mobilization and demobilization; temporary erosion controls; permanent erosion controls; traffic control; clearing, grubbing, tree removal, and tree protection; soil excavation, disposal and grading; residential structure and outbuilding hazardous material assessment and abatement; building demolition; residential structure and outbuilding removals; utility abandonment and removal; abandoning septic tanks in place; closing private wells; permitting; seeding and site restoration; all as provided for in the Bidding Documents.