Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Unita-Wasatch-Cache National Forest
This project consists of removing and replacing the silver lake restroom timber framed roof structure that was damaged in the winter of 2023. Work includes the removal of existing roof framing, protecting in place all existing amenities, disconnecting, salvaging, reinstalling all ceiling mounted electrical, and reconstructing the roof as shown on the plans and in the specifications.
Posted Date
Jul 2, 2026
Due Date
Jul 29, 2026
Release: Jul 2, 2026
Unita-Wasatch-Cache National Forest
Close: Jul 29, 2026
This project consists of removing and replacing the silver lake restroom timber framed roof structure that was damaged in the winter of 2023. Work includes the removal of existing roof framing, protecting in place all existing amenities, disconnecting, salvaging, reinstalling all ceiling mounted electrical, and reconstructing the roof as shown on the plans and in the specifications.
AvailableUnita-Wasatch-Cache National Forest
Provide snow removal.
Posted Date
Apr 29, 2026
Due Date
May 13, 2026
Release: Apr 29, 2026
Unita-Wasatch-Cache National Forest
Close: May 13, 2026
Provide snow removal.
Unita-Wasatch-Cache National Forest
The U.S. Forest Service (USDA), Intermountain Region (Uinta-Wasatch-Cache National Forest) issued a Combined Synopsis/Solicitation for an engine conversion on a SWECO Model 480 Crawler (Serial #20481-373-38-5059A), requiring replacement to meet brand-name or equal specifications. Questions are due by February 19, 2026 and offers are due by February 24, 2026; the work is to be completed by May 15, 2026 and the place of performance is the Ogden Ranger District in Huntsville, UT. The solicitation is a Total Small Business set-aside (NAICS 811310; PSC K028) and the contracting office contact is Whit Fausett (arlen.fausett@usda.gov).
Posted Date
Feb 10, 2026
Due Date
Feb 24, 2026
Release: Feb 10, 2026
Unita-Wasatch-Cache National Forest
Close: Feb 24, 2026
The U.S. Forest Service (USDA), Intermountain Region (Uinta-Wasatch-Cache National Forest) issued a Combined Synopsis/Solicitation for an engine conversion on a SWECO Model 480 Crawler (Serial #20481-373-38-5059A), requiring replacement to meet brand-name or equal specifications. Questions are due by February 19, 2026 and offers are due by February 24, 2026; the work is to be completed by May 15, 2026 and the place of performance is the Ogden Ranger District in Huntsville, UT. The solicitation is a Total Small Business set-aside (NAICS 811310; PSC K028) and the contracting office contact is Whit Fausett (arlen.fausett@usda.gov).
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge