Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Ulster County Soil and Water Conservation District
Contract generally consists of stream restoration, channel stabilization, and associated site restoration approx 1,300 LF. The project is intended to address stream instability, bank erosion, sediment and turbidity concerns, hydraulic conditions, and aquatic habitat limitations while maintaining or improving stream function and water quality. Work is anticipated to include channel reconstruction and/or grading, bed stabilization, bank stabilization, installation of in-stream structures and habitat features, floodplain or bench grading, temporary water control and dewatering measures, erosion and sediment control, access and staging area management, invasive vegetation management where applicable, and final site restoration with native seed, plantings, live stakes, and/or other riparian buffer treatments.
Posted Date
May 27, 2026
Due Date
Jun 22, 2026
Release: May 27, 2026
Ulster County Soil and Water Conservation District
Close: Jun 22, 2026
Contract generally consists of stream restoration, channel stabilization, and associated site restoration approx 1,300 LF. The project is intended to address stream instability, bank erosion, sediment and turbidity concerns, hydraulic conditions, and aquatic habitat limitations while maintaining or improving stream function and water quality. Work is anticipated to include channel reconstruction and/or grading, bed stabilization, bank stabilization, installation of in-stream structures and habitat features, floodplain or bench grading, temporary water control and dewatering measures, erosion and sediment control, access and staging area management, invasive vegetation management where applicable, and final site restoration with native seed, plantings, live stakes, and/or other riparian buffer treatments.
AvailableUlster County Soil and Water Conservation District
Construction of a 40' -0" long by 24' wide by 5" thick sloped concrete floor with a sump and, 80 feet of six inch high and eight inch thick concrete curbs. There will be two 24' â?? 0" wide concrete aprons at both long ends of the covered agri-chemical mixing facility at length of 12'. Vertical posts at eight feet on center, LVL headers, premanufactured trusses and 29 gauge steel roofing will be used to cover the concrete pad and sump, as well as the storage area.
Posted Date
Sep 17, 2025
Due Date
Oct 8, 2025
Release: Sep 17, 2025
Ulster County Soil and Water Conservation District
Close: Oct 8, 2025
Construction of a 40' -0" long by 24' wide by 5" thick sloped concrete floor with a sump and, 80 feet of six inch high and eight inch thick concrete curbs. There will be two 24' â?? 0" wide concrete aprons at both long ends of the covered agri-chemical mixing facility at length of 12'. Vertical posts at eight feet on center, LVL headers, premanufactured trusses and 29 gauge steel roofing will be used to cover the concrete pad and sump, as well as the storage area.
Ulster County Soil and Water Conservation District
The contract consists of the construction of a 40' -0" long by 24' wide by 5" thick sloped concrete floor with a sump and, 80 LF of six inch high and eight inch thick concrete curbs. There will be two 24' wide concrete aprons at both long ends of the covered agri-chemical mixing facility at length of 12'. Vertical posts at eight feet on center, LVL headers, premanufactured trusses and 29 gauge steel roofing will be used to cover the concrete pad and sump, as well as the storage area.
Posted Date
-
Due Date
Oct 8, 2025
Ulster County Soil and Water Conservation District
Close: Oct 8, 2025
The contract consists of the construction of a 40' -0" long by 24' wide by 5" thick sloped concrete floor with a sump and, 80 LF of six inch high and eight inch thick concrete curbs. There will be two 24' wide concrete aprons at both long ends of the covered agri-chemical mixing facility at length of 12'. Vertical posts at eight feet on center, LVL headers, premanufactured trusses and 29 gauge steel roofing will be used to cover the concrete pad and sump, as well as the storage area.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge