Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Turtle Creek Management
Work consists of interior and exterior renovations. Includes remove and dispose of existing floor and well tiles, lighting, cabinets, shower valves/shower head, sink/faucet. Provide and install new delta single handle shower valve body and trim; provide and install new white 24x30 wall cabinets with locks; provide and install new wall mirror; provide and install new wall mirror; provide and install new hospital grade GFI electrical outlets and switches and appropriate cover plates.
Posted Date
Apr 17, 2026
Due Date
May 19, 2026
Release: Apr 17, 2026
Turtle Creek Management
Close: May 19, 2026
Work consists of interior and exterior renovations. Includes remove and dispose of existing floor and well tiles, lighting, cabinets, shower valves/shower head, sink/faucet. Provide and install new delta single handle shower valve body and trim; provide and install new white 24x30 wall cabinets with locks; provide and install new wall mirror; provide and install new wall mirror; provide and install new hospital grade GFI electrical outlets and switches and appropriate cover plates.
AvailableTurtle Creek Management
Work consists of interior and exterior renovations. Includes remove and dispose of existing bathroom tubs; caps off all plumbing; repair floors and walls as needed; remove and dispose of all flooring in all bathrooms; provide and install ADA white toilets with split seats; provide and install ADA pipe wraps; provide and install new LVT flooring and base; remove and dispose of existing bed lights and sconces as well as lights in restrooms; provide and install new bed lights; prep ans install new bed lights; prep and paints all walls and ceilings.
Posted Date
Apr 17, 2026
Due Date
May 21, 2026
Release: Apr 17, 2026
Turtle Creek Management
Close: May 21, 2026
Work consists of interior and exterior renovations. Includes remove and dispose of existing bathroom tubs; caps off all plumbing; repair floors and walls as needed; remove and dispose of all flooring in all bathrooms; provide and install ADA white toilets with split seats; provide and install ADA pipe wraps; provide and install new LVT flooring and base; remove and dispose of existing bed lights and sconces as well as lights in restrooms; provide and install new bed lights; prep ans install new bed lights; prep and paints all walls and ceilings.
AvailableTurtle Creek Management
Work consists of interior and exterior renovations. Work includes remove and dispose of existing flooring and wall base; new LVT flooring installation; remove popcorn ceiling; remove and dispose of existing ceiling lights in restrooms.
Posted Date
Apr 17, 2026
Due Date
May 28, 2026
Release: Apr 17, 2026
Turtle Creek Management
Close: May 28, 2026
Work consists of interior and exterior renovations. Work includes remove and dispose of existing flooring and wall base; new LVT flooring installation; remove popcorn ceiling; remove and dispose of existing ceiling lights in restrooms.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Turtle Creek Management's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database