Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Transit Authority of River City (TARC)
Work includes comprehensive mechanical, electrical, architectural, and structural upgrades throughout the TARC’s T&O facility, including replacement of major HVAC equipment and distribution systems, boiler replacement, electrical switchgear and feeder modifications, lighting and fire-alarm adjustments, selective demolition and finish restoration, new flooring and casework installations, and structural penetrations and reinforcements.
Posted Date
Jun 18, 2026
Due Date
Jul 24, 2026
Release: Jun 18, 2026
Transit Authority of River City (TARC)
Close: Jul 24, 2026
Work includes comprehensive mechanical, electrical, architectural, and structural upgrades throughout the TARC’s T&O facility, including replacement of major HVAC equipment and distribution systems, boiler replacement, electrical switchgear and feeder modifications, lighting and fire-alarm adjustments, selective demolition and finish restoration, new flooring and casework installations, and structural penetrations and reinforcements.
AvailableTransit Authority of River City (TARC)
Provision of qualified contractors to manage and execute a comprehensive ADA paratransit functional assessment, eligibility and recertification services.
Posted Date
Mar 23, 2026
Due Date
Apr 17, 2026
Release: Mar 23, 2026
Transit Authority of River City (TARC)
Close: Apr 17, 2026
Provision of qualified contractors to manage and execute a comprehensive ADA paratransit functional assessment, eligibility and recertification services.
Transit Authority of River City (TARC)
The project includes extensive mechanical, electrical, architectural, and structural upgrades across the facility. The contractor shall furnish all labor, materials, equipment, supervision, and coordination necessary to complete the HVAC and Boiler Replacement & Related Repairs project in accordance with the Contract Documents. Phase 1 consists of all Work required to restore Radio (108) to full operational use. The Contractor shall include in its Proposal the date by which Radio (108) will be complete and ready for re-occupancy. The Owner will review, negotiate, if necessary, and incorporate the agreed-upon Phase 1 completion date into the Contract.
Posted Date
-
Due Date
Apr 13, 2026
Transit Authority of River City (TARC)
Close: Apr 13, 2026
The project includes extensive mechanical, electrical, architectural, and structural upgrades across the facility. The contractor shall furnish all labor, materials, equipment, supervision, and coordination necessary to complete the HVAC and Boiler Replacement & Related Repairs project in accordance with the Contract Documents. Phase 1 consists of all Work required to restore Radio (108) to full operational use. The Contractor shall include in its Proposal the date by which Radio (108) will be complete and ready for re-occupancy. The Owner will review, negotiate, if necessary, and incorporate the agreed-upon Phase 1 completion date into the Contract.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge