Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Township of Upper Providence
Work includes site clearing, sediment removal, grading of the streambanks, streambank stabilization, installation of retaining walls, installation of permanent 100% biodegradable stabilization matting, landscaping, erosion and sediment controls, mill & overlay, guiderail replacement, base repairs, and pavement resurfacing as required to complete the proposed improvements.
Posted Date
Jun 30, 2026
Due Date
Aug 18, 2026
Release: Jun 30, 2026
Township of Upper Providence
Close: Aug 18, 2026
Work includes site clearing, sediment removal, grading of the streambanks, streambank stabilization, installation of retaining walls, installation of permanent 100% biodegradable stabilization matting, landscaping, erosion and sediment controls, mill & overlay, guiderail replacement, base repairs, and pavement resurfacing as required to complete the proposed improvements.
AvailableTownship of Upper Providence
Remove and replace the existing deteriorated storm sewer inlet and 15" reinforced concrete piping running across Lane. Replace existing 15" RCP and inlet with 98 linear feet of 24” HDPE pipe. Replace existing inlet with type 5 box with M-inlet top. Install two (2) proposed DW Endwalls. Install Rip Rap around Endwalls. Full depth pavement restoration. Final site stabilization.
Posted Date
Apr 30, 2026
Due Date
May 15, 2026
Release: Apr 30, 2026
Township of Upper Providence
Close: May 15, 2026
Remove and replace the existing deteriorated storm sewer inlet and 15" reinforced concrete piping running across Lane. Replace existing 15" RCP and inlet with 98 linear feet of 24” HDPE pipe. Replace existing inlet with type 5 box with M-inlet top. Install two (2) proposed DW Endwalls. Install Rip Rap around Endwalls. Full depth pavement restoration. Final site stabilization.
Township of Upper Providence
Demolition of the house, garage, and all other structures and debris. All basement, foundation, and footers are to be removed. The excavated void shall be filled with select clean fill at 12” lifts compacted in place. The site shall be left clean, graded, and stabilized; no remnants of any kind. The contractor is responsible for leaving the site clean and clear of all debris.
Posted Date
Apr 3, 2026
Due Date
Apr 28, 2026
Release: Apr 3, 2026
Township of Upper Providence
Close: Apr 28, 2026
Demolition of the house, garage, and all other structures and debris. All basement, foundation, and footers are to be removed. The excavated void shall be filled with select clean fill at 12” lifts compacted in place. The site shall be left clean, graded, and stabilized; no remnants of any kind. The contractor is responsible for leaving the site clean and clear of all debris.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $23,200, use sole source.
Coops: If your offering is on COSTARS, ask them to purchase via COSTARS. Not on COSTARS: Prepare a formal competitive bid through the PennBid portal.
Township of Upper Providence, PA: There is no evidence of sole source awards above the $23,200 threshold.
Board meetings and strategic plans from Township of Upper Providence
The meeting included the introduction of the new Parks and Recreation Director and public comments regarding street lighting and a leaf blower ordinance. Key discussion topics included township certifications such as Bird Town and Bee City, grant status updates for stormwater management and park signage, ongoing survey reviews for the leaf blower ordinance, and promotion of the birding project. The committee also discussed home composting initiatives, planting activities and resource management planning at Upper Providence Preserve, efforts to address road salt pollution, content for the upcoming township newsletter, and planning for Community Day.
The agenda focuses on discussions regarding mosquito-borne disease control, township certifications for Bird Town and Bee City, and updates on grant applications and a gas-powered leaf blower survey. Additional topics include a birding project, composting initiatives, strategies for social media usage, and an MS4 meeting.
The Council discussed several key business items, including updates on the 2026 Road Program, the status of capital projects, and reports on parks and recreation developments, specifically regarding fundraising for the Cherry Street Park Master Plan. The Police Chief provided a report on departmental statistics and current operational updates. New business actions included the approval of a voucher list, the selection of a contractor for the demolition of 1401 N. Providence Road, the cancellation of specific summer meetings, and the authorization of a contract with Sparks, NPC for fundraising assistance. Additionally, the Council addressed a public forum and received updates regarding an EMS Authority initiative.
The council discussed the status of the Delco ESA initiative, provided an update on the Quint 73 fire truck, and shared details regarding the upcoming America 250 celebration. Financial approvals included a voucher list and the acceptance of a bid for the Hunt Club Lane improvement project. Resolutions were passed regarding support for the Pennsylvania Commission for the United States Semi-Quincentennial and participation in the Delaware County Consortium of Governments. The council also approved a field use application for the Media Providence Friends School and authorized a mural project for the Cherry Street Park building.
The board reviewed monthly expenses and budget status, noting a deposit made to the PLGIT account. Updates were provided on grinder pump repair and replacement costs, the status of Local Shared Account grant applications for a backup generator at the Bortondale Pump Station, and the acquisition of grant funding for the Greenhill Road sewer replacement project. The engineer reported on routine support and force main relocation analysis. Discussion was held regarding the board composition and potential authority to adjust the number of members. Additionally, the board discussed the potential engagement of a collection agency for recovering outstanding balances and requested a formal proposal for further review.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Township of Upper Providence's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Building Code Official (equivalent to Building Official)
Premium
Access the largest public sector contact database
© 2026 Starbridge