Blackmore Road Reconstruction - Phase 1, Perry Township, Ohio, LEC Project No. 2025-011, OPWC No. DGAD01
-
Closes
Aug 19, 2026
The Lake County Engineer's Office seeks bids for the Blackmore Road Reconstruction - Phase 1 project in Perry Township, Ohio, identified as LEC Project No. 2025-011 and OPWC No. DGAD01. The construction work includes regrading an existing drainage channel, replacing a catch basin, installing underdrains, and coordinating additional drainage work with the county engineer. It also includes full-depth pavement reconstruction, roadway widening and reclamation with cement, curbs and catch basins, removal of existing railroad tracks, and excavation to remove a roadway hump across two construction seasons.