Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Township of Hamilton
Provide and place approx. 141 ton of 25mm base course PG64S-22, 0.0 to 0.3 million ESALs in the area of the new culvert compacted to 4" for 265 ft. Approx. 1,000 tons of 1" 9.5 scratch and leveling course, PG64-22, 0.0 to 0.3 million ESALs. Provide and apply approx. 1,574 tons of Superpave 9.5mm wearing course, 1.5" compacted depth 9.5mm overlay PG64-22, 0.0 to 0.3 million ESAL's, SRL, L or better
Posted Date
Jun 13, 2026
Due Date
Jul 1, 2026
Release: Jun 13, 2026
Township of Hamilton
Close: Jul 1, 2026
Provide and place approx. 141 ton of 25mm base course PG64S-22, 0.0 to 0.3 million ESALs in the area of the new culvert compacted to 4" for 265 ft. Approx. 1,000 tons of 1" 9.5 scratch and leveling course, PG64-22, 0.0 to 0.3 million ESALs. Provide and apply approx. 1,574 tons of Superpave 9.5mm wearing course, 1.5" compacted depth 9.5mm overlay PG64-22, 0.0 to 0.3 million ESAL's, SRL, L or better
AvailableTownship of Hamilton
Furnish and install approx. 100 LF of 18" diameter and 3,200 LF of 21" diameter PVC gravity sewer, installation/ replacement of 16 manholes, installation/replacement of a precast meter chamber, replacement and/or reconnection of associated sewer laterals, and other miscellaneous work.
Posted Date
Nov 6, 2025
Due Date
Dec 11, 2025
Release: Nov 6, 2025
Township of Hamilton
Close: Dec 11, 2025
Furnish and install approx. 100 LF of 18" diameter and 3,200 LF of 21" diameter PVC gravity sewer, installation/ replacement of 16 manholes, installation/replacement of a precast meter chamber, replacement and/or reconnection of associated sewer laterals, and other miscellaneous work.
Township of Hamilton
Sale of a used equipment: 2020 case 821g with bucket and operational hours no more than 6,500 hours. Options include enclosed rops, heat, a/c, rear defrost, radio, air seat w/ heat, jrb 4. 5 cu. Yd. Bucket capacity with boce, jrb coupler compatible to volvo attachments, ride control, remote control, rear camera, 3rd valve hydraulics with hoses run to coupler, fenders, counterweights, powershift transmission, engine turbo, 4wd, differential lock, 3 lever volvo controls, articulating, with 23. 5 r25 radial tires with at least 60% remaining tread on front and rear.
Posted Date
Oct 27, 2025
Due Date
Nov 19, 2025
Release: Oct 27, 2025
Township of Hamilton
Close: Nov 19, 2025
Sale of a used equipment: 2020 case 821g with bucket and operational hours no more than 6,500 hours. Options include enclosed rops, heat, a/c, rear defrost, radio, air seat w/ heat, jrb 4. 5 cu. Yd. Bucket capacity with boce, jrb coupler compatible to volvo attachments, ride control, remote control, rear camera, 3rd valve hydraulics with hoses run to coupler, fenders, counterweights, powershift transmission, engine turbo, 4wd, differential lock, 3 lever volvo controls, articulating, with 23. 5 r25 radial tires with at least 60% remaining tread on front and rear.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $23,800, deprioritize sole source; environment is rigid and favors formal competition (board approval required for purchases over $10,000).
Coops: If they’re open, suggest exploring COSTARS/DGS Statewide/OMNIA/Sourcewell for future efficiency; buyer hasn’t historically used coops but you can encourage them to explore.
Entity: Township of Hamilton, PA
Status: Limited/no sole source flexibility; deprioritize this path.
Board meetings and strategic plans from Township of Hamilton
The board approved an employee health insurance plan and directed the submission of a PennDOT response form regarding a roadway safety improvement project. Discussions included a waiver request for the Whiskey Run Vista project, which was partially granted for timbering activities only, and the authorization to advertise for material bids. The board also approved a letter of consistency for water treatment plant upgrades for the Bear Valley Franklin County Joint Authority and granted a real estate tax exemption for a disabled veteran.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Township of Hamilton's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge