Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Township of Hamilton
Furnish and install approx. 100 LF of 18" diameter and 3,200 LF of 21" diameter PVC gravity sewer, installation/ replacement of 16 manholes, installation/replacement of a precast meter chamber, replacement and/or reconnection of associated sewer laterals, and other miscellaneous work.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Spring Hill
Northeast interceptor sewer project.
Posted Date
Oct 22, 2025
Due Date
Dec 4, 2025
Release: Oct 22, 2025
City of Spring Hill
Close: Dec 4, 2025
Northeast interceptor sewer project.
Borough of Quarryville
Installation of approx. 2,730 LF of 8" Diameter CIPP liner, replacement and raising of 8 manhole frames and covers and the lining of 8 manholes with Sprayroq, by-pass pumping and restoration as shown on the map and as specified. Construction sequence provided hereinafter is general in nature and shall provide the basis of preparation of a detailed construction schedule by Contractor: 1.Install any by-pass pumping equipment. 2.Perform preinstallation cleaning and video documentation. 3. Install CIPP lining system. 4. Replace manhole frames and covers and raise manhole to existing ground surface. 5. Install any by-pass pumping and install Sprayroq lining system in manholes. 6. Site restoration.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Posted Date
Nov 4, 2025
Due Date
Dec 4, 2025
Release: Nov 4, 2025
Borough of Quarryville
Close: Dec 4, 2025
Installation of approx. 2,730 LF of 8" Diameter CIPP liner, replacement and raising of 8 manhole frames and covers and the lining of 8 manholes with Sprayroq, by-pass pumping and restoration as shown on the map and as specified. Construction sequence provided hereinafter is general in nature and shall provide the basis of preparation of a detailed construction schedule by Contractor: 1.Install any by-pass pumping equipment. 2.Perform preinstallation cleaning and video documentation. 3. Install CIPP lining system. 4. Replace manhole frames and covers and raise manhole to existing ground surface. 5. Install any by-pass pumping and install Sprayroq lining system in manholes. 6. Site restoration.
Loudon Water
Work includes removal and replacement of 24 manholes, 1 discharge vault, and various lengths and sizes of sanitary sewer pipe. The scope also includes traffic control, sheeting/shoring/bracing, and temporary bypass pumping.
Posted Date
Oct 21, 2025
Due Date
Jan 8, 2026
Release: Oct 21, 2025
Loudon Water
Close: Jan 8, 2026
Work includes removal and replacement of 24 manholes, 1 discharge vault, and various lengths and sizes of sanitary sewer pipe. The scope also includes traffic control, sheeting/shoring/bracing, and temporary bypass pumping.
AvailableSomerset-Berkley Regional Public Schools
Window replacement project.
Posted Date
-
Due Date
Dec 19, 2025
Somerset-Berkley Regional Public Schools
Close: Dec 19, 2025
Window replacement project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →