Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Deprioritize sole source; unless truly unique, expect a formal bid—so pivot back to COSTARS.
Coops: Start with COSTARS: confirm your product (or partner) is on an active COSTARS contract and route the purchase through it.
Entity: Township of Findlay, PA.
Evidence: No documented sole-source awards in available board minutes or bid records.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Township of Findlay's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Public Works Director
Township Manager
School Resource Officer
Building Inspector
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Township of Findlay
Work includes approx. 44,550 SY of superpave bituminous wearing course, 15,500 LF of bituminous wedge curb, 44,550 SY of asphalt milling, 51,450 SY of bituminous seal coat, pavement markings, traffic control, and other work as further described in the contract documents.
Posted Date
Jan 8, 2026
Due Date
Feb 5, 2026
Release: Jan 8, 2026
Township of Findlay
Close: Feb 5, 2026
Work includes approx. 44,550 SY of superpave bituminous wearing course, 15,500 LF of bituminous wedge curb, 44,550 SY of asphalt milling, 51,450 SY of bituminous seal coat, pavement markings, traffic control, and other work as further described in the contract documents.
AvailableTownship of Findlay
Construction of booster pump station. Work under contract 2025-01a involves but is not limited to the following scope of work: a) site work necessary to install improvements. B) installation of a new public drinking water booster pump station. C) installation of new pumps, piping, valves, trolley system, and vfd. Pumps, control valves and vfd to be supplied by owner. D) installation of site piping, fencing, valves, access ways, and other site appurtenances. E) construction of new ductile iron pipe extensions to connect to existing facilities. Work under electrical contract 2025-01b includes but not limited to: a) installation of panel boards, disconnected switches, control panels, instrumentation, generator, and any other electrical equipment specified in division 16. B) connection of all cables and conduits to the specific destinations shown on contract drawings. See attached file.
Posted Date
Sep 29, 2025
Due Date
Oct 23, 2025
Release: Sep 29, 2025
Township of Findlay
Close: Oct 23, 2025
Construction of booster pump station. Work under contract 2025-01a involves but is not limited to the following scope of work: a) site work necessary to install improvements. B) installation of a new public drinking water booster pump station. C) installation of new pumps, piping, valves, trolley system, and vfd. Pumps, control valves and vfd to be supplied by owner. D) installation of site piping, fencing, valves, access ways, and other site appurtenances. E) construction of new ductile iron pipe extensions to connect to existing facilities. Work under electrical contract 2025-01b includes but not limited to: a) installation of panel boards, disconnected switches, control panels, instrumentation, generator, and any other electrical equipment specified in division 16. B) connection of all cables and conduits to the specific destinations shown on contract drawings. See attached file.
Township of Findlay
Replacement of traffic signal equipment and pedestrian improvements at the intersection of Road and Park Drive. The improvements include traffic signal equipment, signs, and pedestrian curb ramps.
Posted Date
Jul 3, 2025
Due Date
Jul 31, 2025
Release: Jul 3, 2025
Township of Findlay
Close: Jul 31, 2025
Replacement of traffic signal equipment and pedestrian improvements at the intersection of Road and Park Drive. The improvements include traffic signal equipment, signs, and pedestrian curb ramps.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.