Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Township of Exeter
1,075 CY Roadway Excavation; 6,350 SY of Superpave Base Course, 25 mm; 6,350 SY of Superpave Wearing Course, 9.5 mm, 1 Type D-E Endwall; 1,315 SY of Bituminous Swale (top only), and Site Restoration. Add Alternate 1 – 315 SY Excavation; 1,795 SY of Superpave Base Course, 25 mm; 1,795 SY of Superpave Wearing Course, 9.5 mm. Add Alternate 2 – 260 CY Excavation; 1,510 SY of Superpave Base Course, 25 mm; 1,510 SY of Superpave Wearing Course, 9.5 mm.
Posted Date
Jun 4, 2026
Due Date
Jul 2, 2026
Release: Jun 4, 2026
Township of Exeter
Close: Jul 2, 2026
1,075 CY Roadway Excavation; 6,350 SY of Superpave Base Course, 25 mm; 6,350 SY of Superpave Wearing Course, 9.5 mm, 1 Type D-E Endwall; 1,315 SY of Bituminous Swale (top only), and Site Restoration. Add Alternate 1 – 315 SY Excavation; 1,795 SY of Superpave Base Course, 25 mm; 1,795 SY of Superpave Wearing Course, 9.5 mm. Add Alternate 2 – 260 CY Excavation; 1,510 SY of Superpave Base Course, 25 mm; 1,510 SY of Superpave Wearing Course, 9.5 mm.
AvailableTownship of Exeter
An IFB for Reeser's Landing Improvements in Exeter Township, Berks County, PA solicits construction work to rebuild the boat ramp and associated site improvements to support motorized and non-motorized boats. Bids are due March 6, 2026 at 4:00 PM EST, and all bid documents are available on the PennBid (Bonfire) opportunity page. The project's period of performance requires completion by May 25, 2026.
Posted Date
Feb 6, 2026
Due Date
Mar 6, 2026
Release: Feb 6, 2026
Township of Exeter
Close: Mar 6, 2026
An IFB for Reeser's Landing Improvements in Exeter Township, Berks County, PA solicits construction work to rebuild the boat ramp and associated site improvements to support motorized and non-motorized boats. Bids are due March 6, 2026 at 4:00 PM EST, and all bid documents are available on the PennBid (Bonfire) opportunity page. The project's period of performance requires completion by May 25, 2026.
Township of Exeter
Scope of work generally includes traffic signal improvements i.e., traffic signal controller assemblies, traffic signal vehicular signals, signal cabling, controller timing adjustments, and other construction elements associated with traffic signals. Work includes 1 LS of mobilization; 4 EA of controller modification, controller upgrade, econolite cobalt; 36 LF of backplate retrofit; 3 LF of video detection system; 2 EA of radar detection system, two approaches; 1 EA of radar detection system, one approach.
Posted Date
Oct 13, 2025
Due Date
Nov 12, 2025
Release: Oct 13, 2025
Township of Exeter
Close: Nov 12, 2025
Scope of work generally includes traffic signal improvements i.e., traffic signal controller assemblies, traffic signal vehicular signals, signal cabling, controller timing adjustments, and other construction elements associated with traffic signals. Work includes 1 LS of mobilization; 4 EA of controller modification, controller upgrade, econolite cobalt; 36 LF of backplate retrofit; 3 LF of video detection system; 2 EA of radar detection system, two approaches; 1 EA of radar detection system, one approach.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than ~$23,800, use sole source only with state-level justification; otherwise deprioritize.
Coops: First route the purchase through COSTARS or BuyBoard; confirm the process with Admin/Finance.
Township of Exeter (PA)
Policy: No defined local sole source policy identified; state-level justification is required. Deprioritize this path.
Board meetings and strategic plans from Township of Exeter
The document contains minutes from a board meeting.
The document contains the minutes from the meeting held in March 2019.
The provided document contains minutes regarding organizational or procedural updates, though specific details of the discussion topics are not legible from the source provided.
The board meeting addressed several administrative and financial items. Key discussions included the authorization to advertise a public hearing for an amendment to the township's zoning ordinance regarding solar energy systems, a review of the first-quarter 2026 budget performance across various funds, and discussions regarding the recruitment of an assistant public works director. Additionally, the board proposed an ordinance amendment to consolidate public comment procedures.
The Planning Commission discussed a request for a septic separation distance waiver for a property located at 5700 Bertown Pike. The proposal includes drilling a new well with a reduced isolation distance of 60 feet, utilizing advanced construction standards, steel casing, and a bentonite clay seal. The applicant also plans to implement a UV sterilization system for water treatment to ensure safety. Following a review of the site plan and confirmation of the Sewage Enforcement Officer's endorsement, the Commission moved to recommend that the Board of Supervisors approve the requested waiver.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Township of Exeter's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge