Town of Seelyville Water System Improvements
Posted
Sep 4, 2026
Sep 30, 2026
The project will be bid with four (4) divisions of work: Division A Replacement of Filter Media in four (4) horizontal pressure filters to include gravel bed and Greensand Plus Media at the water treatment facility. Installation of a gas chlorine scrubber system and associated concrete pad at the water treatment facility. Install all associated piping, connections, and appurtenances connecting scrubber to Chlorine room. Contractor is responsible for all erosion control, site restoration, electrical, and controls as generally intended for the project Division B Rehabilitation of two existing 500,000 gallon glass-lined, bolted steel ground storage tanks Contractor is responsible for all temporary water storage tanks, temporary piping, erosion control, and site restoration as generally intended for the project Division C Installation of approximately 22,000 feet of 6-inch water main.