Booster Pump and Water Meter Replacement, Delta Regional Authority RFP
Posted
Oct 21, 2026
Nov 13, 2026
Work generally consists of but not limited to removal of the existing booster pumping station & fittings, installation of a new booster pumping station w/foundation and electrical connections; 80 LF of 6" DI water main; 4 EA 6" gate valves; 2 EA 6" tees; 6 EA 6" 45o bends, 50 new residential water meters, box, and curb stops, 2 new 4" well meters and other related items.



