Phase 1 - Wastewater Improvements Project RFP
Posted
Oct 20, 2026
Nov 23, 2026
Project includes improvements to the Town's existing wastewater treatment plant (WWTP) and collection system. The WWTP work includes but is not limited to headworks improvements: new in-channel articulating rake screen and manual bypass bar screen, ancillary structure modifications to reinforced concrete structure, grating, handrail and platform; aerated cell lagoon improvements: sludge removal, hauling and disposal, new floating aerators, new controls; replacement of clarifier tank plug valves, replacement of chlorine contact tank drain valve, new influent and effluent samplers and all other work required for the completion of WWTP improvements. The collection system work includes but is not limited to upgrading Lift Station #1, new submersible pumps, new monitoring and control package with VFDs and all lift station accessories for a complete operational pump system. The existing valve vault work includes replacement of check valves. Additional work includes bypass pumping, electrical utility coordination, perimeter fence installation and all other work required for the completion of the lift station improvements.
