Resurfacing Project on Ronnerud Lane east of CTH F RFP
Aug 6, 2026
Closes
Aug 28, 2026
The project consists of pulverizing .53 mile and adding 4" of 1 1/4" aggregate. Base material added to any inferior portions of Ronnerud Lane to widen the road to two, 10-feet wide driving lanes, grading, re-establishing crown, rolling, watering and applying a double sealcoat. Shoulders added where needed. The project will consist of approx: 500 CY of base material, 200 CY of shoulder material, 4,400 gallons of high float emulsion asphalt, 130 CY of 3/8" clean limestone chips and all labor and equipment to complete the project.