Highpoint Road Asphalt Paving Project RFP
Aug 5, 2026
Closes
Aug 19, 2026
Work includes final grading, placement of 3" of asphalt pavement, and shoulder installation, approx. 5,280 FT. 1 LS fine grade, shape, water, and compact roadway, 24' wide. Furnish and install 2,246 Ton WisDOT Spec 4LT asphalt mix or greater, compacted in two lifts totaling 3", to construct a 22' finished roadway (11' each lane). Load tickets required. Contractor is to furnish, load, haul, place and compact 282 Ton of 3/4" CABC shoulder gravel on roadway 1' wide. Weight Tickets Required.