Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Town of Blackville
Construct the Community Pavilion, including stage, covered pavilion structure, restrooms, storage/janitor/electrical rooms, and associated site improvements shown in the bid documents. Provide site preparation, grading, compacted fill, erosion control, stabilized construction entrance, site access control, temporary controls, and final stabilization. Provide concrete, masonry, structural framing, roof framing, roofing, siding, finishes, stairs, ramps, railings, doors, hardware, and related architectural/structural work. Provide plumbing, restroom fixtures, drinking fountains, sanitary/water connections, mechanical exhaust/ventilation only, electrical service, code-required and drawing-required lighting, receptacles, panels, grounding, and all related MEP work shown or reasonably required by the supplied drawings and applicable codes. No heating or air-conditioning system is included in the Base Bid unless added by written addendum. Provide ADA/ICC A117.1 accessible routes, rear accessible grading, ramps/walks/landings/railings where required, signage, fixture clearances, and accessibility details. Provide sidewalk/access route work required to serve the pavilion itself as part of the Base Bid, including required accessible routes, ramp connections, landings, immediate tie-ins, and any sidewalk work necessary for code-compliant access to the pavilion. Earthwork, grading, compaction, and drainage. Erosion control, construction entrance, and housekeeping. Specialty stage lighting, sound, and audio/visual exclusion.
Posted Date
Feb 5, 2026
Due Date
Jun 15, 2026
Release: Feb 5, 2026
Town of Blackville
Close: Jun 15, 2026
Construct the Community Pavilion, including stage, covered pavilion structure, restrooms, storage/janitor/electrical rooms, and associated site improvements shown in the bid documents. Provide site preparation, grading, compacted fill, erosion control, stabilized construction entrance, site access control, temporary controls, and final stabilization. Provide concrete, masonry, structural framing, roof framing, roofing, siding, finishes, stairs, ramps, railings, doors, hardware, and related architectural/structural work. Provide plumbing, restroom fixtures, drinking fountains, sanitary/water connections, mechanical exhaust/ventilation only, electrical service, code-required and drawing-required lighting, receptacles, panels, grounding, and all related MEP work shown or reasonably required by the supplied drawings and applicable codes. No heating or air-conditioning system is included in the Base Bid unless added by written addendum. Provide ADA/ICC A117.1 accessible routes, rear accessible grading, ramps/walks/landings/railings where required, signage, fixture clearances, and accessibility details. Provide sidewalk/access route work required to serve the pavilion itself as part of the Base Bid, including required accessible routes, ramp connections, landings, immediate tie-ins, and any sidewalk work necessary for code-compliant access to the pavilion. Earthwork, grading, compaction, and drainage. Erosion control, construction entrance, and housekeeping. Specialty stage lighting, sound, and audio/visual exclusion.
AvailableTown of Blackville
Work includes site work, demolition work, yard piping, valves, mechanical piping, electrical and appurtenances all associated with the following parts of the project: new influent pump station, new aeration basin influent splitter box, conversion of existing sbr basins to continuous activated sludge process, new secondary clarifiers and ras pump station, new waste activated sludge pumps, new sludge digestion and dewatering facilities.
Posted Date
Feb 5, 2025
Due Date
Mar 12, 2025
Release: Feb 5, 2025
Town of Blackville
Close: Mar 12, 2025
Work includes site work, demolition work, yard piping, valves, mechanical piping, electrical and appurtenances all associated with the following parts of the project: new influent pump station, new aeration basin influent splitter box, conversion of existing sbr basins to continuous activated sludge process, new secondary clarifiers and ras pump station, new waste activated sludge pumps, new sludge digestion and dewatering facilities.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge