Oakwood Watermain RFP
Aug 19, 2026
Closes
Sep 3, 2026
Construction of approx 655 LF of 6" directionally bored hdpe potable water main, tracer wire, valves, fittings, fire hydrants, service connections, pressure testing, disinfection, and surface restoration.
