Rehabilitate the Air Traffic Control Tower Hvac Systems
Aug 3, 2026
Closes
Aug 25, 2026
Project consists of the replacement of existing hvac systems serving the air traffic control tower. Work includes demolition, removal, and installation of rooftop units, air handling units, condensing units, ductwork, air distribution devices, refrigerant piping, and controls. The installed hvac systems are to be complete with humidification.
