Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
The Steel Rivers Council of Governments (SRCOG)
Demolition. Demolition of four (4) residential structures in Borough, including utility disconnections; sewer lateral removal and capping; extermination of rodents; asbestos abatement; building demolition and removal of outbuildings, trees, fences; proper disposal of materials; backfill with suitable material; compaction; grading; and all incidentals as required by municipal engineer.
Posted Date
Mar 26, 2026
Due Date
Apr 14, 2026
Release: Mar 26, 2026
The Steel Rivers Council of Governments (SRCOG)
Close: Apr 14, 2026
Demolition. Demolition of four (4) residential structures in Borough, including utility disconnections; sewer lateral removal and capping; extermination of rodents; asbestos abatement; building demolition and removal of outbuildings, trees, fences; proper disposal of materials; backfill with suitable material; compaction; grading; and all incidentals as required by municipal engineer.
AvailableThe Steel Rivers Council of Governments (SRCOG)
Work includes approx 1 EA excavate and cap waterline before curb box valve; 3,850 LF 2" pavement compacted depth of superpave 19mm binder material; 9 EA 3/4" copper service line. See attached file.
Posted Date
Oct 16, 2025
Due Date
Feb 5, 2026
Release: Oct 16, 2025
The Steel Rivers Council of Governments (SRCOG)
Close: Feb 5, 2026
Work includes approx 1 EA excavate and cap waterline before curb box valve; 3,850 LF 2" pavement compacted depth of superpave 19mm binder material; 9 EA 3/4" copper service line. See attached file.
The Steel Rivers Council of Governments (SRCOG)
Work includes installation of bound rubber mulching surface on existing concrete, delivery and installation of two (2) climbing play structures, restoration of surrounding area, and other details as directed by the municipal engineer.
Posted Date
Sep 25, 2025
Due Date
Oct 16, 2025
Release: Sep 25, 2025
The Steel Rivers Council of Governments (SRCOG)
Close: Oct 16, 2025
Work includes installation of bound rubber mulching surface on existing concrete, delivery and installation of two (2) climbing play structures, restoration of surrounding area, and other details as directed by the municipal engineer.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track The Steel Rivers Council of Governments (SRCOG)'s board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database