Work consists of horizontal directional drilling of an 8" HDPE waterline across Boudreaux Canal and open-cut installation of two sections of 6" C900 PVC waterline, including all necessary fittings and connections to the existing water system.
Buyer Attributes
Key metrics and characteristics
City
The city where this buyer is located.
Houma
County
The county where this buyer is located.
Terrebonne Parish
Address
Physical address of this buyer.
8814 Main St.
Zip Code
Postal code for this buyer's location.
70363
Propensity to Spend
How likely this buyer is to spend on new technology based on operating budget trends.
CautiousAggressive
Higher is better Unlock
AI Adoption Score
How likely this buyer is to adopt new AI technologies.
ConservativeEarly Adopter
Higher is better Unlock
Startup Friendliness
How often this buyer champions startups and early adoption.
Board meetings and strategic plans from Terrebonne Parish Consolidated Waterworks District #1
Board of Commissioners of Consolidated Waterworks District No. 1 Second Monthly Meeting
Date: Aug 17, 2026Type: Meeting mention
The board received updates on several key infrastructure projects, including the replacement of transmission lines, waterline replacements at a canal crossing, effluent separation planning, pump station design, and a meter replacement program. The board approved capital improvement bills for payment and authorized engineering amendments for waterline relocation and infrastructure reconfiguration. Additionally, the board approved the advertisement of bids for the effluent separation project and announced committee assignments.
Board of Commissioners of Consolidated Waterworks District No. 1 Second Monthly Meeting
Date: Sep 21, 2026Type: Meeting mention
The Board received a public inquiry regarding a proposed pump station and reviewed progress reports on several engineering projects, including transmission line replacements, canal crossings, effluent separation, pump station design, and a meter replacement program. The Board authorized the execution of a contract for a new Enterprise Resource Planning System, ratified a bid date change for a separation project, approved capital improvement bills, and renewed the existing retiree group health insurance plan. Additionally, the scheduled Executive Session was postponed.
Key Contacts
Public-sector contacts connected to Terrebonne Parish Consolidated Waterworks District #1.
Salary, Benefit & Insurance Committee of Consolidated Waterworks District No. 1 Meeting Minutes
Date: Sep 21, 2026Type: Meeting mention
The committee discussed the 2027 Post-65 Retiree Group Health Renewals submitted by Humana. The discussion focused on a proposed 6.96% premium increase, bringing costs from $318.23 to $340.38 per participant. Clarifications were provided regarding eligibility criteria and participant definitions. The committee ultimately moved to recommend that the full Board renew the current insurance policy with Humana for the upcoming year.
Extracted from official board minutes, strategic plans, and video transcripts.
Meeting signals
Know what buyers discuss before RFPs drop
Track Terrebonne Parish Consolidated Waterworks District #1 meetings, strategic plans, and budget discussions before the public bid appears.