Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Tazewell County Public Service Authority
This project consists of the replacement of existing waterlines. In addition, the water lines will be upgraded to allow for the installation of fire hydrants. The Project consists of constructing: Contract No. 1 - will consist of approx. 12,750 LF of 8" water main, 13,700 LF of 6" water main, 3,900 LF of 2" water main, 3,000 L.F. of service lines, 104 Meters and Settings, 100 Service reconnections, 4 Service relocations, valves, hydrants, and all appurtenances. Contract No. 2 - will consist of approx. 8,800 LF of 8" water main, 11,300 LF of 6" water main, 8,600 LF of 4" water main, 4,600 LF of 2" water main, 3,300 LF of service lines, 49 Meters and Settings, 47 Service reconnections, 2 Service relocations, bridge modifications, valves, hydrants, and all appurtenances. Contract No. 3 - will consist of either the rehabilitation or replacement of a 250,000-gallon water storage tank (Yards Storage Tank) and all appurtenances. Contract No. 4 - will consist of either the rehabilitation or replacement of a 225,000-gallon water storage tank (Shop Hollow Storage Tank) and all appurtenances.
Posted Date
Nov 10, 2025
Due Date
Apr 23, 2026
Release: Nov 10, 2025
Tazewell County Public Service Authority
Close: Apr 23, 2026
This project consists of the replacement of existing waterlines. In addition, the water lines will be upgraded to allow for the installation of fire hydrants. The Project consists of constructing: Contract No. 1 - will consist of approx. 12,750 LF of 8" water main, 13,700 LF of 6" water main, 3,900 LF of 2" water main, 3,000 L.F. of service lines, 104 Meters and Settings, 100 Service reconnections, 4 Service relocations, valves, hydrants, and all appurtenances. Contract No. 2 - will consist of approx. 8,800 LF of 8" water main, 11,300 LF of 6" water main, 8,600 LF of 4" water main, 4,600 LF of 2" water main, 3,300 LF of service lines, 49 Meters and Settings, 47 Service reconnections, 2 Service relocations, bridge modifications, valves, hydrants, and all appurtenances. Contract No. 3 - will consist of either the rehabilitation or replacement of a 250,000-gallon water storage tank (Yards Storage Tank) and all appurtenances. Contract No. 4 - will consist of either the rehabilitation or replacement of a 225,000-gallon water storage tank (Shop Hollow Storage Tank) and all appurtenances.
AvailableTazewell County Public Service Authority
Provude one(1) 2026 ford f250 4x4 3/4 ton service truck.
Posted Date
Jul 16, 2025
Due Date
Aug 18, 2025
Release: Jul 16, 2025
Tazewell County Public Service Authority
Close: Aug 18, 2025
Provude one(1) 2026 ford f250 4x4 3/4 ton service truck.
Tazewell County Public Service Authority
Contract I Water infrastructure improvements include construction of a new 10-inch water line and appurtenances to connect to the existing water system and a service meter and valve vault to serve the fishery. Contract II Water infrastructure improvements include upgrades at three existing water pump stations. Contract III Sewer infrastructure improvements include construction of a new sewage lift station to serve the new fishery, a new 6-inch force main and appurtenances to connect the new lift station to an existing influent lift station which conveys sewage to the existing sewage treatment plant, and upgrades at the existing influent lift station.
Posted Date
Jun 8, 2024
Due Date
Dec 1, 2025
Release: Jun 8, 2024
Tazewell County Public Service Authority
Close: Dec 1, 2025
Contract I Water infrastructure improvements include construction of a new 10-inch water line and appurtenances to connect to the existing water system and a service meter and valve vault to serve the fishery. Contract II Water infrastructure improvements include upgrades at three existing water pump stations. Contract III Sewer infrastructure improvements include construction of a new sewage lift station to serve the new fishery, a new 6-inch force main and appurtenances to connect the new lift station to an existing influent lift station which conveys sewage to the existing sewage treatment plant, and upgrades at the existing influent lift station.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Tazewell County Public Service Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database