Work Release Dormitory Building RFP
Aug 4, 2026
Closes
Aug 31, 2026
Construction of a pre-engineered metal building with dormitory space and amenities for approx. 180 work-release inmates, approx. 9,600 SF structure shall be bent metal frame with r-panel metal siding, approximately 140 feet long by 80 LF wide overall, including an attached 20 foot wide pull-through portico at one end of the building. Project to be located within the existing property boundary of the parish jail.
