Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Tahlequah Regional Dev. Authority
Provide cutting and baling of the grounds.
Posted Date
Mar 17, 2026
Due Date
Apr 10, 2026
Release: Mar 17, 2026
Tahlequah Regional Dev. Authority
Close: Apr 10, 2026
Provide cutting and baling of the grounds.
AvailableTahlequah Regional Dev. Authority
Project consists of Multiple Bid packages for renovation construction of an existing 13,955 SF facility. Bid Packages: P-1 Demolition; P-2 Concrete; P-3 Rough Carpentry; P-4 Finish Carpentry & millwork; P-5 Roofing, Flashing, gutters & Downspouts; P-6 Doors, Frames & Hardware (Material Supplier only); P-7 Glazing and aluminum storefront; P-8 Overhead doors & Openers; P-9 Framing, Sheetrock, Acoustical Ceilings & Sheetrock Finishing; P-10 Resilient Flooring, Base & Ceramic Tile; P-11 Painting; P-12 Specialties (Material Supplier only); P-13 Door, Hardware & specialties Installation. Installation of Bid packages P-6 & P-12; P-14 Plumbing; P-15 HVAC; P-16 Automatic Fire Sprinkler; P-17 Electrical; P-18 Addressable Fire-Alarm System.
Posted Date
Feb 5, 2026
Due Date
Feb 24, 2026
Release: Feb 5, 2026
Tahlequah Regional Dev. Authority
Close: Feb 24, 2026
Project consists of Multiple Bid packages for renovation construction of an existing 13,955 SF facility. Bid Packages: P-1 Demolition; P-2 Concrete; P-3 Rough Carpentry; P-4 Finish Carpentry & millwork; P-5 Roofing, Flashing, gutters & Downspouts; P-6 Doors, Frames & Hardware (Material Supplier only); P-7 Glazing and aluminum storefront; P-8 Overhead doors & Openers; P-9 Framing, Sheetrock, Acoustical Ceilings & Sheetrock Finishing; P-10 Resilient Flooring, Base & Ceramic Tile; P-11 Painting; P-12 Specialties (Material Supplier only); P-13 Door, Hardware & specialties Installation. Installation of Bid packages P-6 & P-12; P-14 Plumbing; P-15 HVAC; P-16 Automatic Fire Sprinkler; P-17 Electrical; P-18 Addressable Fire-Alarm System.
Tahlequah Regional Dev. Authority
Conduct 2024-2025 audit for one-year.
Posted Date
Jun 22, 2025
Due Date
Jul 3, 2025
Release: Jun 22, 2025
Tahlequah Regional Dev. Authority
Close: Jul 3, 2025
Conduct 2024-2025 audit for one-year.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Tahlequah Regional Dev. Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database