Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Sun Valley Public Service District Water And Sewer
Purchase of one new 2026 compact mini excavator.
Posted Date
Jun 16, 2026
Due Date
Jul 13, 2026
Release: Jun 16, 2026
Sun Valley Public Service District Water And Sewer
Close: Jul 13, 2026
Purchase of one new 2026 compact mini excavator.
AvailableSun Valley Public Service District Water And Sewer
Work includes approx 16,400 LF of 6" and 2" water lines. Project will also consist of 20 high pressure water meters 2 fire hydrants, 4 post flushing hydrants, 6 air release valves, and all related appurtenances.
Posted Date
Dec 17, 2025
Due Date
Jan 21, 2026
Release: Dec 17, 2025
Sun Valley Public Service District Water And Sewer
Close: Jan 21, 2026
Work includes approx 16,400 LF of 6" and 2" water lines. Project will also consist of 20 high pressure water meters 2 fire hydrants, 4 post flushing hydrants, 6 air release valves, and all related appurtenances.
Sun Valley Public Service District Water And Sewer
This project consists of the installation of approx. 575 LF of 12” PVC gravity sewer line, 300 LF of 8” ductile iron gravity sewer line, 8,775 LF of 8” PVC gravity sewer line, 3,100 LF of 6” PVC gravity sewer line, 100 LF of 6” HDPE gravity sewer line, and 600 LF of 1 1/2” HDPE force main. Additionally, the Work includes pump upgrades to an existing lift station, the decommissioning of one (1) existing lift station, installation of two (2) package grinder simplex stations, one (1) package grinder duplex station, approx. sixty-eight (68) new 48” manholes, five (5) remove and replace existing manholes, approx. 1,800 LF of DOH Type “B’ trench repair, approx. 1,000 LF of DOH Type “C” trench repair, fifty-two (52) customer cleanouts, and all other appurtenances shown on the plans or detailed in the specifications that are necessary for a complete and operatable gravity sewer extension project.
Posted Date
Sep 16, 2024
Due Date
Oct 17, 2024
Release: Sep 16, 2024
Sun Valley Public Service District Water And Sewer
Close: Oct 17, 2024
This project consists of the installation of approx. 575 LF of 12” PVC gravity sewer line, 300 LF of 8” ductile iron gravity sewer line, 8,775 LF of 8” PVC gravity sewer line, 3,100 LF of 6” PVC gravity sewer line, 100 LF of 6” HDPE gravity sewer line, and 600 LF of 1 1/2” HDPE force main. Additionally, the Work includes pump upgrades to an existing lift station, the decommissioning of one (1) existing lift station, installation of two (2) package grinder simplex stations, one (1) package grinder duplex station, approx. sixty-eight (68) new 48” manholes, five (5) remove and replace existing manholes, approx. 1,800 LF of DOH Type “B’ trench repair, approx. 1,000 LF of DOH Type “C” trench repair, fifty-two (52) customer cleanouts, and all other appurtenances shown on the plans or detailed in the specifications that are necessary for a complete and operatable gravity sewer extension project.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge