This project consists of the installation of approx. 575 LF of 12” PVC gravity sewer line, 300 LF of 8” ductile iron gravity sewer line, 8,775 LF of 8” PVC gravity sewer line, 3,100 LF of 6” PVC gravity sewer line, 100 LF of 6” HDPE gravity sewer line, and 600 LF of 1 1/2” HDPE force main. Additionally, the Work includes pump upgrades to an existing lift station, the decommissioning of one (1) existing lift station, installation of two (2) package grinder simplex stations, one (1) package grinder duplex station, approx. sixty-eight (68) new 48” manholes, five (5) remove and replace existing manholes, approx. 1,800 LF of DOH Type “B’ trench repair, approx. 1,000 LF of DOH Type “C” trench repair, fifty-two (52) customer cleanouts, and all other appurtenances shown on the plans or detailed in the specifications that are necessary for a complete and operatable gravity sewer extension project.