SPWUA Conveyance Project, Phase 1A RFP
Jul 31, 2026
Closes
Sep 2, 2026
Project will include the installation approx 5,990 LF of 54" hdpe, slip-lining through existing siphons for approx. 2,360 LF, and pipeline appurtenances. 8,440 LF of 54" hdpe pipe including trenching, compaction, and backfill, isolation valves, combination air and vacuum valves, end user connections, and other pipeline appurtenances, as well as approximately 190 LF of slip-lining through an existing siphons with 48" hdpe pipe.