Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Stony Brook Regional Sewer Authority's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Manager of Engineering
Treasurer
Finance Director / Chief Financial Officer
Executive Director & Board Secretary
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Stony Brook Regional Sewer Authority
Supply of Schwing Pump Parts.
Posted Date
Nov 17, 2025
Due Date
Jan 14, 2026
Release: Nov 17, 2025
Stony Brook Regional Sewer Authority
Close: Jan 14, 2026
Supply of Schwing Pump Parts.
AvailableStony Brook Regional Sewer Authority
The work includes the heavy power washing and complete three stage epoxy recoating of the interior of the station, all metallic surfaces, primarily aluminum will be cleaned, some areas of spalling concrete will be repaired, access ladder to be removed, cleaned and reinstalled with new stainless steel bolts and fasteners, removal of existing access hatch and replacement of air tight access hatch, removal and disposal of the interior fan and humidifier, installation of a new fan (mounted on the exterior) with a new electrical connection to the existing interior lighting and the new fan and air piping located at Meter Station.
Posted Date
Nov 11, 2025
Due Date
Dec 4, 2025
Release: Nov 11, 2025
Stony Brook Regional Sewer Authority
Close: Dec 4, 2025
The work includes the heavy power washing and complete three stage epoxy recoating of the interior of the station, all metallic surfaces, primarily aluminum will be cleaned, some areas of spalling concrete will be repaired, access ladder to be removed, cleaned and reinstalled with new stainless steel bolts and fasteners, removal of existing access hatch and replacement of air tight access hatch, removal and disposal of the interior fan and humidifier, installation of a new fan (mounted on the exterior) with a new electrical connection to the existing interior lighting and the new fan and air piping located at Meter Station.
Stony Brook Regional Sewer Authority
The work includes comprehensive upgrades to the existing heating, ventilation, and air conditioning (HVAC) systems serving approximately 23,000 square feet of office, laboratory, and process areas in the Operations Building. The project involves the removal and replacement of multiple large-capacity air-handling units, installation of new variable air volume (VAV) terminal units, exhaust fans, ductwork, process and chilled-water piping, and a replacement of the existing control system with a direct digital control (DDC) system fully integrated with the facility's building management system. Work also includes new electrical power distribution and control wiring, fireproofing and insulation, and architectural restoration of all impacted areas.
Posted Date
Oct 28, 2025
Due Date
Dec 9, 2025
Release: Oct 28, 2025
Stony Brook Regional Sewer Authority
Close: Dec 9, 2025
The work includes comprehensive upgrades to the existing heating, ventilation, and air conditioning (HVAC) systems serving approximately 23,000 square feet of office, laboratory, and process areas in the Operations Building. The project involves the removal and replacement of multiple large-capacity air-handling units, installation of new variable air volume (VAV) terminal units, exhaust fans, ductwork, process and chilled-water piping, and a replacement of the existing control system with a direct digital control (DDC) system fully integrated with the facility's building management system. Work also includes new electrical power distribution and control wiring, fireproofing and insulation, and architectural restoration of all impacted areas.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.