Lumberjack Landing Site Improvements
Jul 17, 2026
Closes
Aug 11, 2026
Removals of existing pavements and features. Installed pavement materials including: bituminous drive and trails, concrete walk, permeable pavers, and grass pave. Additional site features include: ADA kayak launch, concrete stairs and abutment, metal handrails, boulder retaining walls, stormwater basins, landscaping and erosion control.
