Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
State of Nevada Public Works Division
Well water system improvements and related electrical improvements.
Posted Date
Jan 13, 2025
Due Date
Feb 6, 2025
Release: Jan 13, 2025
State of Nevada Public Works Division
Close: Feb 6, 2025
Well water system improvements and related electrical improvements.
State of Nevada Public Works Division
Upgrade Heating and Air Conditioning.
Posted Date
Jul 21, 2025
Due Date
Aug 20, 2025
Release: Jul 21, 2025
State of Nevada Public Works Division
Close: Aug 20, 2025
Upgrade Heating and Air Conditioning.
State of Nevada Public Works Division
Perform roadway improvements on the section of roadway identified in the attached map. This will include asphalt patching at two locations, crack sealing, applying micro-surfacing and re-striping the entire specified roadway section. All work will be completed in accordance with industry standards to ensure quality and durability. The general tasks include: Crack Sealing: Clean all cracks and joints to remove debris and vegetation, and seal cracks 1/4\" or larger with a suitable rubberized or mastic sealing product. The work will follow the appropriate guidelines for crack treatment, including the potential use of the overband method for sealing. Micro-Surfacing: Prepare the pavement surfaces by cleaning and removing any loose materials or oil spots. The application of micro-surfacing will be done according to established guidelines, ensuring smooth joints and proper coverage without excessive buildup. All utility lids will be masked before application and unmasked afterward, and proper work area protection will be implemented. Asphalt Patching: Remove damaged asphalt, sawcut for clean edges, and compact the existing base material to the required specifications. Any necessary imported base material will be used. A tack coat will be applied to edges before placing the hot mix asphalt patch, which will be compacted to meet the specified thickness. Roadway Striping: After the paving work is complete, the contractor will apply appropriate striping to the roadway as per the requirements.
Posted Date
Apr 7, 2025
Due Date
Apr 22, 2025
Release: Apr 7, 2025
State of Nevada Public Works Division
Close: Apr 22, 2025
Perform roadway improvements on the section of roadway identified in the attached map. This will include asphalt patching at two locations, crack sealing, applying micro-surfacing and re-striping the entire specified roadway section. All work will be completed in accordance with industry standards to ensure quality and durability. The general tasks include: Crack Sealing: Clean all cracks and joints to remove debris and vegetation, and seal cracks 1/4\" or larger with a suitable rubberized or mastic sealing product. The work will follow the appropriate guidelines for crack treatment, including the potential use of the overband method for sealing. Micro-Surfacing: Prepare the pavement surfaces by cleaning and removing any loose materials or oil spots. The application of micro-surfacing will be done according to established guidelines, ensuring smooth joints and proper coverage without excessive buildup. All utility lids will be masked before application and unmasked afterward, and proper work area protection will be implemented. Asphalt Patching: Remove damaged asphalt, sawcut for clean edges, and compact the existing base material to the required specifications. Any necessary imported base material will be used. A tack coat will be applied to edges before placing the hot mix asphalt patch, which will be compacted to meet the specified thickness. Roadway Striping: After the paving work is complete, the contractor will apply appropriate striping to the roadway as per the requirements.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track State of Nevada Public Works Division's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database