Repaving HIARNG B119J POV Lot 8 RFP
Aug 5, 2026
Closes
Aug 26, 2026
Work includes demolishing existing pavement and subsurface of the parking lot which is approximately 13,000 sqft going 9" down and installing the same square footing (3250 cubic feet) of State-Mix IV hot-mix asphalt (HMA) on top of new base course (6500 cubic feet).
