Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Sonoma County Water Agency
Provide regional water infrastructure engineering and related services.
Posted Date
Jun 22, 2026
Due Date
Jul 22, 2026
Release: Jun 22, 2026
Sonoma County Water Agency
Close: Jul 22, 2026
Provide regional water infrastructure engineering and related services.
AvailableSonoma County Water Agency
Provision of consultant for providing watershed wildfire vulnerability assessment services.
Posted Date
Jun 25, 2026
Due Date
Jul 22, 2026
Release: Jun 25, 2026
Sonoma County Water Agency
Close: Jul 22, 2026
Provision of consultant for providing watershed wildfire vulnerability assessment services.
AvailableSonoma County Water Agency
Work consists of river diversion structure improvements, includes removal and replacement of existing river diversion equipment and structures, such as access platforms, a medium voltage switchgear, a step-down transformer, a motor control center, vertical turbine pumps, piping, facility lighting, heating, ventilation, and air conditioning, and a programmable logic controller, and construction of a flow metering system including vaults, meters, piping, electrical, and instrumentation.
Posted Date
Jun 22, 2026
Due Date
Jul 21, 2026
Release: Jun 22, 2026
Sonoma County Water Agency
Close: Jul 21, 2026
Work consists of river diversion structure improvements, includes removal and replacement of existing river diversion equipment and structures, such as access platforms, a medium voltage switchgear, a step-down transformer, a motor control center, vertical turbine pumps, piping, facility lighting, heating, ventilation, and air conditioning, and a programmable logic controller, and construction of a flow metering system including vaults, meters, piping, electrical, and instrumentation.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Sonoma County Water Agency
This strategic plan for Sonoma Water outlines a five-year roadmap focusing on core functions of water supply, wastewater, and flood control. It addresses challenges such as climate change, evolving technology, and aging infrastructure through six key goals: Organizational Excellence, Planning and Infrastructure, Environmental Stewardship, Emergency Preparedness, Climate Change, and Community Engagement. The plan aims to ensure resilient water resources and provide reliable essential services for a thriving community and a healthy environment.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Sonoma County Water Agency's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge