New Architectural Entrance Door RFP
Aug 20, 2026
Closes
Sep 10, 2026
The scope of work includes: Removal of the existing 3'0" x 6'8" double panel door and save for future reinstallation by others. Removal of the existing threshold is required Furnish and install a new Special-Lite SL-36 double panel door with hardware per the specifications included in these bid documents. The new doors and hardware must match the two existing doors previously installed at the school. (contractor to verify) A new threshold is required; grouting and leveling beneath the threshold may be necessary.
