Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Skippack Township
The work is situated along various locations in the Township and includes 3” milling; 3” Pervious paving and top soil, raking and seeding.
Posted Date
Jul 27, 2026
Due Date
Aug 11, 2026
Release: Jul 27, 2026
Skippack Township
Close: Aug 11, 2026
The work is situated along various locations in the Township and includes 3” milling; 3” Pervious paving and top soil, raking and seeding.
AvailableSkippack Township
Sign and stop sign. Traffic control and maintenance; installation and removal of alternate path; five feet paved pedestrian trail and concrete curb; the removal of existing concrete sidewalk and ADA ramps as well as replacement of concrete and ADA ramps. Painted pedestrian crosswalk, stop bar, and new street name sign and traffic control signs; top soil, rake and seed; ADA compliant fencing.
Posted Date
Mar 1, 2026
Due Date
Apr 7, 2026
Release: Mar 1, 2026
Skippack Township
Close: Apr 7, 2026
Sign and stop sign. Traffic control and maintenance; installation and removal of alternate path; five feet paved pedestrian trail and concrete curb; the removal of existing concrete sidewalk and ADA ramps as well as replacement of concrete and ADA ramps. Painted pedestrian crosswalk, stop bar, and new street name sign and traffic control signs; top soil, rake and seed; ADA compliant fencing.
Skippack Township
The work along roadways will include: BASE BID STREETS - Victoria Drive - Mobilization, Core Samples, Traffic Control, 1-1/2” Milling (3872 sy), 5” Base Repair (1500 sy), Leveling Course (220 tons), Remove & Replace Inlet C Tops (23 tops), Remove & Replace ADA ramp & landing (4 ea), Remove & Replace 4” Concrete sidewalk (384 sf), Remove & Replace Concrete Curb (120 lf), 1-1/2” Wearing Course (3,872 sy); Erin Court – Mobilization, Core Samples, Traffic Control, 1-1/2” Milling (2,632 sy), 5” Base Repair (800 sy), Leveling Course (90 tons), Remove & replace Inet C Tops (4 ea), Remove & Replace ADA ramp & landing (2 ea), Remove & Replace 4” Concrete sidewalk (192 sf), Remove & Replace Concrete Curb (60 lf), 1-1/2” Wearing Course (2,632 sy), Christina Court – Mobilization (1 ea), Core Samples (1 ea), Traffic Control (1 ea), 1-1/2” Milling (2456 sy), 5” Base Repair (900 sy), Leveling Course (90 tons), Remove & Replace Inet C Tops (5 ea), Remove & Replace ADA ramp & landing (2 ea), Remove & Replace 4” Concrete sidewalk (192 sf), Remove & Replace Concrete Curb (60 lf), 1-1/2” Wearing Course (2456 sy); Skip View Road – Mobilization, Core Samples, Traffic Control, 1-1/2” Milling (1,643 sy), 5” Base Repair (1000 sy), Leveling Course (100 tons), Remove & Replace Inlet C Tops (6 ea), Remove & Replace ADA ramp & landing, Remove & Replace 4” Concrete sidewalk (112 sf), Remove & Replace Concrete Curb (20 lf), Install New ADA Ramp & landing, 1-1/2” Wearing Course (1,643 sy); Wingate Drive – Mobilization, Core Samples, Traffic Control, 1-1/2” Milling (4928 sy), 5” Base Repair (2000 sy), Leveling Course (300 tons), Remove & Replace Inlet C Tops (14 ea), Remove & Replace ADA ramp & landing (4 ea), Remove & Replace 4” Concrete sidewalk (448 sf), Remove & Replace Concrete Curb (80 lf), 1-1/2” Wearing Course (4,928 sy); Ironbridge Drive – Mobilization, Core Samples, Traffic Control, 1-1/2” Milling (3,168 sy), 5” Base Repair (1,500 sy), Leveling Course (300 tons), Remove & Replace Inet C Tops (9 ea), Remove & Replace ADA ramp & landing (4ea), Remove & Replace 4” Concrete sidewalk (448 sf), Remove & Replace Concrete Curb (80 lf), 1-1/2” Wearing Course (3,168 sy); Mockingbird Ln – Mobilization, Core Samples, Traffic Control, 1-1/2” Milling (1,173 sy), 5” Base Repair (500 sy), Leveling Course (90 tons), Remove & Replace Inlet C Tops (4 ea), Remove & Replace ADA ramp & landing (2 ea), Remove & Replace 4” Concrete sidewalk (224 sf), Remove & Replace Concrete Curb (40 lf), 1-1/2” Wearing Course (9,973 sy). ALTERNATE STREETS -- Martha Ln – Mobilization, Core Samples, Traffic Control,1-1/2” Milling (3512 sy), 5” Base Repair (1000 sy), Leveling Course (110 tons), 1-1/2” Wearing Course (3,512 sy); Squirrel Hill Rd – Mobilization, Core Samples, Traffic Control, 1-1/2” Milling (9,973 sy), 5” Base Repair (1,500sy), Leveling Course (200 tons), Remove & Replace Inet M Top, Remove & Replace ADA ramp & landing, Remove & Replace 4” Concrete sidewalk (112 sf) Remove & Replace Concrete Curb (20 lf), 1-1/2” Wearing Course (9,973 sy); Tranquility Street – Mobilization, Core Samples, Traffic Control, 1-1/2” Milling (3637 sy), 5” Base Repair (800 sy), Leveling Course (150 tons), Remove & Replace Inet C Tops (11 ea), Remove & Replace Inet M Tops, Remove & Replace Inlet Frame & Grate, Remove & Replace ADA ramp & landing (4 ea), Remove & Replace 4” Concrete sidewalk (448 sf), Remove & Replace Concrete Curb (80 lf), 1-1/2” Wearing Course (3637 sy); Andrew Court – Mobilization, Core Samples, Traffic Control, 1-1/2” Milling (1,928 sy), 5” Base Repair (800 sy), Leveling Course (90 tons), Remove & Replace Inlet C Tops (3 ea), Remove & Replace ADA ramp & landing (2 ea), Remove & Replace 4” Concrete sidewalk (224 sf), Remove & Replace Concrete Curb (40 lf), 1-1/2” Wearing Course (1,928 sy).
Posted Date
Jan 23, 2026
Due Date
Feb 6, 2026
Release: Jan 23, 2026
Skippack Township
Close: Feb 6, 2026
The work along roadways will include: BASE BID STREETS - Victoria Drive - Mobilization, Core Samples, Traffic Control, 1-1/2” Milling (3872 sy), 5” Base Repair (1500 sy), Leveling Course (220 tons), Remove & Replace Inlet C Tops (23 tops), Remove & Replace ADA ramp & landing (4 ea), Remove & Replace 4” Concrete sidewalk (384 sf), Remove & Replace Concrete Curb (120 lf), 1-1/2” Wearing Course (3,872 sy); Erin Court – Mobilization, Core Samples, Traffic Control, 1-1/2” Milling (2,632 sy), 5” Base Repair (800 sy), Leveling Course (90 tons), Remove & replace Inet C Tops (4 ea), Remove & Replace ADA ramp & landing (2 ea), Remove & Replace 4” Concrete sidewalk (192 sf), Remove & Replace Concrete Curb (60 lf), 1-1/2” Wearing Course (2,632 sy), Christina Court – Mobilization (1 ea), Core Samples (1 ea), Traffic Control (1 ea), 1-1/2” Milling (2456 sy), 5” Base Repair (900 sy), Leveling Course (90 tons), Remove & Replace Inet C Tops (5 ea), Remove & Replace ADA ramp & landing (2 ea), Remove & Replace 4” Concrete sidewalk (192 sf), Remove & Replace Concrete Curb (60 lf), 1-1/2” Wearing Course (2456 sy); Skip View Road – Mobilization, Core Samples, Traffic Control, 1-1/2” Milling (1,643 sy), 5” Base Repair (1000 sy), Leveling Course (100 tons), Remove & Replace Inlet C Tops (6 ea), Remove & Replace ADA ramp & landing, Remove & Replace 4” Concrete sidewalk (112 sf), Remove & Replace Concrete Curb (20 lf), Install New ADA Ramp & landing, 1-1/2” Wearing Course (1,643 sy); Wingate Drive – Mobilization, Core Samples, Traffic Control, 1-1/2” Milling (4928 sy), 5” Base Repair (2000 sy), Leveling Course (300 tons), Remove & Replace Inlet C Tops (14 ea), Remove & Replace ADA ramp & landing (4 ea), Remove & Replace 4” Concrete sidewalk (448 sf), Remove & Replace Concrete Curb (80 lf), 1-1/2” Wearing Course (4,928 sy); Ironbridge Drive – Mobilization, Core Samples, Traffic Control, 1-1/2” Milling (3,168 sy), 5” Base Repair (1,500 sy), Leveling Course (300 tons), Remove & Replace Inet C Tops (9 ea), Remove & Replace ADA ramp & landing (4ea), Remove & Replace 4” Concrete sidewalk (448 sf), Remove & Replace Concrete Curb (80 lf), 1-1/2” Wearing Course (3,168 sy); Mockingbird Ln – Mobilization, Core Samples, Traffic Control, 1-1/2” Milling (1,173 sy), 5” Base Repair (500 sy), Leveling Course (90 tons), Remove & Replace Inlet C Tops (4 ea), Remove & Replace ADA ramp & landing (2 ea), Remove & Replace 4” Concrete sidewalk (224 sf), Remove & Replace Concrete Curb (40 lf), 1-1/2” Wearing Course (9,973 sy). ALTERNATE STREETS -- Martha Ln – Mobilization, Core Samples, Traffic Control,1-1/2” Milling (3512 sy), 5” Base Repair (1000 sy), Leveling Course (110 tons), 1-1/2” Wearing Course (3,512 sy); Squirrel Hill Rd – Mobilization, Core Samples, Traffic Control, 1-1/2” Milling (9,973 sy), 5” Base Repair (1,500sy), Leveling Course (200 tons), Remove & Replace Inet M Top, Remove & Replace ADA ramp & landing, Remove & Replace 4” Concrete sidewalk (112 sf) Remove & Replace Concrete Curb (20 lf), 1-1/2” Wearing Course (9,973 sy); Tranquility Street – Mobilization, Core Samples, Traffic Control, 1-1/2” Milling (3637 sy), 5” Base Repair (800 sy), Leveling Course (150 tons), Remove & Replace Inet C Tops (11 ea), Remove & Replace Inet M Tops, Remove & Replace Inlet Frame & Grate, Remove & Replace ADA ramp & landing (4 ea), Remove & Replace 4” Concrete sidewalk (448 sf), Remove & Replace Concrete Curb (80 lf), 1-1/2” Wearing Course (3637 sy); Andrew Court – Mobilization, Core Samples, Traffic Control, 1-1/2” Milling (1,928 sy), 5” Base Repair (800 sy), Leveling Course (90 tons), Remove & Replace Inlet C Tops (3 ea), Remove & Replace ADA ramp & landing (2 ea), Remove & Replace 4” Concrete sidewalk (224 sf), Remove & Replace Concrete Curb (40 lf), 1-1/2” Wearing Course (1,928 sy).
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Not a viable path here—pivot to COSTARS instead.
Coops: Frequently procures through COSTARS and OMNIA Partners; you can gain access through the Starbridge reseller & contract-vehicle platform — reach out to your Starbridge contact to pursue onboarding.
Entity: Skippack Township, PA.
Status: No evidence of an active sole source pathway or threshold in practice; township relies on competitive bidding.
Board meetings and strategic plans from Skippack Township
The meeting focused on the land development proposal for 4388 Skippack Pike, involving the construction of a 6,400 square foot commercial flex building for automotive use. The commission discussed the project and reached a consensus to schedule a special meeting to allow for proper voting after correcting procedural agenda posting issues. Staff reports provided updates on township paving projects, the completion of the Palmer Park playground, infrastructure repairs on Church Road and Route 73, and the completion of bridge repairs on Evansburg Road.
The Planning Commission reviewed a land development plan for 4388 Skippack Pike submitted by R&R Martino Properties, LLC. The Commission voted to accept the plan subject to the conditions specified in the Township Engineer's report. There were no reports from the engineer, planner, or township manager.
The board meeting involved an executive session focused on litigation. A key discussion topic was the statement issued regarding the cancellation of the Fourth of July parade and fireworks due to extreme heat and public safety concerns. Furthermore, the meeting included a presentation from the Prothonotary's office regarding their role in the county, with a focus on initiatives to support domestic violence survivors, such as the Hope Card program and the online Protection From Abuse packet filing system.
The Board reviewed several administrative and operational items, including presentations on a POW/MIA chair of honor, a proposed butterfly bench, and the Perkiomen Valley America 250 Consortium. Key actions included authorizing bidding for garage improvements, appointing a contractor for building repair studies, and approving various payments for road and park projects. The Board also discussed municipal ordinances regarding fire inspections, residential licensing, and data centers. Additionally, four members were appointed to the Parks and Recreation Board, and discussions were initiated regarding the creation of an Environmental Advisory Board and an Open Space Committee.
The Board of Supervisors discussed public safety reports including EMS call volumes, fire department responses, and tanker repairs. The Board authorized the issuance of bids for trail restoration and approved a land development resolution involving the demolition of a property to be acquired by a conservancy. Additionally, the Board reviewed resolutions for sewer extension projects and discussed a stream bank flood plain reconnection project to address sediment pollution and water quality improvements.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Skippack Township's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Certified Building Inspector (CBI) - Keystone Municipal Services, Inc.
Premium
Access the largest public sector contact database
© 2026 Starbridge