Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Skippack Township
Sign and stop sign. Traffic control and maintenance; installation and removal of alternate path; five feet paved pedestrian trail and concrete curb; the removal of existing concrete sidewalk and ADA ramps as well as replacement of concrete and ADA ramps. Painted pedestrian crosswalk, stop bar, and new street name sign and traffic control signs; top soil, rake and seed; ADA compliant fencing.
Posted Date
Mar 1, 2026
Due Date
Apr 7, 2026
Release: Mar 1, 2026
Skippack Township
Close: Apr 7, 2026
Sign and stop sign. Traffic control and maintenance; installation and removal of alternate path; five feet paved pedestrian trail and concrete curb; the removal of existing concrete sidewalk and ADA ramps as well as replacement of concrete and ADA ramps. Painted pedestrian crosswalk, stop bar, and new street name sign and traffic control signs; top soil, rake and seed; ADA compliant fencing.
Skippack Township
The work along roadways will include: BASE BID STREETS - Victoria Drive - Mobilization, Core Samples, Traffic Control, 1-1/2” Milling (3872 sy), 5” Base Repair (1500 sy), Leveling Course (220 tons), Remove & Replace Inlet C Tops (23 tops), Remove & Replace ADA ramp & landing (4 ea), Remove & Replace 4” Concrete sidewalk (384 sf), Remove & Replace Concrete Curb (120 lf), 1-1/2” Wearing Course (3,872 sy); Erin Court – Mobilization, Core Samples, Traffic Control, 1-1/2” Milling (2,632 sy), 5” Base Repair (800 sy), Leveling Course (90 tons), Remove & replace Inet C Tops (4 ea), Remove & Replace ADA ramp & landing (2 ea), Remove & Replace 4” Concrete sidewalk (192 sf), Remove & Replace Concrete Curb (60 lf), 1-1/2” Wearing Course (2,632 sy), Christina Court – Mobilization (1 ea), Core Samples (1 ea), Traffic Control (1 ea), 1-1/2” Milling (2456 sy), 5” Base Repair (900 sy), Leveling Course (90 tons), Remove & Replace Inet C Tops (5 ea), Remove & Replace ADA ramp & landing (2 ea), Remove & Replace 4” Concrete sidewalk (192 sf), Remove & Replace Concrete Curb (60 lf), 1-1/2” Wearing Course (2456 sy); Skip View Road – Mobilization, Core Samples, Traffic Control, 1-1/2” Milling (1,643 sy), 5” Base Repair (1000 sy), Leveling Course (100 tons), Remove & Replace Inlet C Tops (6 ea), Remove & Replace ADA ramp & landing, Remove & Replace 4” Concrete sidewalk (112 sf), Remove & Replace Concrete Curb (20 lf), Install New ADA Ramp & landing, 1-1/2” Wearing Course (1,643 sy); Wingate Drive – Mobilization, Core Samples, Traffic Control, 1-1/2” Milling (4928 sy), 5” Base Repair (2000 sy), Leveling Course (300 tons), Remove & Replace Inlet C Tops (14 ea), Remove & Replace ADA ramp & landing (4 ea), Remove & Replace 4” Concrete sidewalk (448 sf), Remove & Replace Concrete Curb (80 lf), 1-1/2” Wearing Course (4,928 sy); Ironbridge Drive – Mobilization, Core Samples, Traffic Control, 1-1/2” Milling (3,168 sy), 5” Base Repair (1,500 sy), Leveling Course (300 tons), Remove & Replace Inet C Tops (9 ea), Remove & Replace ADA ramp & landing (4ea), Remove & Replace 4” Concrete sidewalk (448 sf), Remove & Replace Concrete Curb (80 lf), 1-1/2” Wearing Course (3,168 sy); Mockingbird Ln – Mobilization, Core Samples, Traffic Control, 1-1/2” Milling (1,173 sy), 5” Base Repair (500 sy), Leveling Course (90 tons), Remove & Replace Inlet C Tops (4 ea), Remove & Replace ADA ramp & landing (2 ea), Remove & Replace 4” Concrete sidewalk (224 sf), Remove & Replace Concrete Curb (40 lf), 1-1/2” Wearing Course (9,973 sy). ALTERNATE STREETS -- Martha Ln – Mobilization, Core Samples, Traffic Control,1-1/2” Milling (3512 sy), 5” Base Repair (1000 sy), Leveling Course (110 tons), 1-1/2” Wearing Course (3,512 sy); Squirrel Hill Rd – Mobilization, Core Samples, Traffic Control, 1-1/2” Milling (9,973 sy), 5” Base Repair (1,500sy), Leveling Course (200 tons), Remove & Replace Inet M Top, Remove & Replace ADA ramp & landing, Remove & Replace 4” Concrete sidewalk (112 sf) Remove & Replace Concrete Curb (20 lf), 1-1/2” Wearing Course (9,973 sy); Tranquility Street – Mobilization, Core Samples, Traffic Control, 1-1/2” Milling (3637 sy), 5” Base Repair (800 sy), Leveling Course (150 tons), Remove & Replace Inet C Tops (11 ea), Remove & Replace Inet M Tops, Remove & Replace Inlet Frame & Grate, Remove & Replace ADA ramp & landing (4 ea), Remove & Replace 4” Concrete sidewalk (448 sf), Remove & Replace Concrete Curb (80 lf), 1-1/2” Wearing Course (3637 sy); Andrew Court – Mobilization, Core Samples, Traffic Control, 1-1/2” Milling (1,928 sy), 5” Base Repair (800 sy), Leveling Course (90 tons), Remove & Replace Inlet C Tops (3 ea), Remove & Replace ADA ramp & landing (2 ea), Remove & Replace 4” Concrete sidewalk (224 sf), Remove & Replace Concrete Curb (40 lf), 1-1/2” Wearing Course (1,928 sy).
Posted Date
Jan 23, 2026
Due Date
Feb 6, 2026
Release: Jan 23, 2026
Skippack Township
Close: Feb 6, 2026
The work along roadways will include: BASE BID STREETS - Victoria Drive - Mobilization, Core Samples, Traffic Control, 1-1/2” Milling (3872 sy), 5” Base Repair (1500 sy), Leveling Course (220 tons), Remove & Replace Inlet C Tops (23 tops), Remove & Replace ADA ramp & landing (4 ea), Remove & Replace 4” Concrete sidewalk (384 sf), Remove & Replace Concrete Curb (120 lf), 1-1/2” Wearing Course (3,872 sy); Erin Court – Mobilization, Core Samples, Traffic Control, 1-1/2” Milling (2,632 sy), 5” Base Repair (800 sy), Leveling Course (90 tons), Remove & replace Inet C Tops (4 ea), Remove & Replace ADA ramp & landing (2 ea), Remove & Replace 4” Concrete sidewalk (192 sf), Remove & Replace Concrete Curb (60 lf), 1-1/2” Wearing Course (2,632 sy), Christina Court – Mobilization (1 ea), Core Samples (1 ea), Traffic Control (1 ea), 1-1/2” Milling (2456 sy), 5” Base Repair (900 sy), Leveling Course (90 tons), Remove & Replace Inet C Tops (5 ea), Remove & Replace ADA ramp & landing (2 ea), Remove & Replace 4” Concrete sidewalk (192 sf), Remove & Replace Concrete Curb (60 lf), 1-1/2” Wearing Course (2456 sy); Skip View Road – Mobilization, Core Samples, Traffic Control, 1-1/2” Milling (1,643 sy), 5” Base Repair (1000 sy), Leveling Course (100 tons), Remove & Replace Inlet C Tops (6 ea), Remove & Replace ADA ramp & landing, Remove & Replace 4” Concrete sidewalk (112 sf), Remove & Replace Concrete Curb (20 lf), Install New ADA Ramp & landing, 1-1/2” Wearing Course (1,643 sy); Wingate Drive – Mobilization, Core Samples, Traffic Control, 1-1/2” Milling (4928 sy), 5” Base Repair (2000 sy), Leveling Course (300 tons), Remove & Replace Inlet C Tops (14 ea), Remove & Replace ADA ramp & landing (4 ea), Remove & Replace 4” Concrete sidewalk (448 sf), Remove & Replace Concrete Curb (80 lf), 1-1/2” Wearing Course (4,928 sy); Ironbridge Drive – Mobilization, Core Samples, Traffic Control, 1-1/2” Milling (3,168 sy), 5” Base Repair (1,500 sy), Leveling Course (300 tons), Remove & Replace Inet C Tops (9 ea), Remove & Replace ADA ramp & landing (4ea), Remove & Replace 4” Concrete sidewalk (448 sf), Remove & Replace Concrete Curb (80 lf), 1-1/2” Wearing Course (3,168 sy); Mockingbird Ln – Mobilization, Core Samples, Traffic Control, 1-1/2” Milling (1,173 sy), 5” Base Repair (500 sy), Leveling Course (90 tons), Remove & Replace Inlet C Tops (4 ea), Remove & Replace ADA ramp & landing (2 ea), Remove & Replace 4” Concrete sidewalk (224 sf), Remove & Replace Concrete Curb (40 lf), 1-1/2” Wearing Course (9,973 sy). ALTERNATE STREETS -- Martha Ln – Mobilization, Core Samples, Traffic Control,1-1/2” Milling (3512 sy), 5” Base Repair (1000 sy), Leveling Course (110 tons), 1-1/2” Wearing Course (3,512 sy); Squirrel Hill Rd – Mobilization, Core Samples, Traffic Control, 1-1/2” Milling (9,973 sy), 5” Base Repair (1,500sy), Leveling Course (200 tons), Remove & Replace Inet M Top, Remove & Replace ADA ramp & landing, Remove & Replace 4” Concrete sidewalk (112 sf) Remove & Replace Concrete Curb (20 lf), 1-1/2” Wearing Course (9,973 sy); Tranquility Street – Mobilization, Core Samples, Traffic Control, 1-1/2” Milling (3637 sy), 5” Base Repair (800 sy), Leveling Course (150 tons), Remove & Replace Inet C Tops (11 ea), Remove & Replace Inet M Tops, Remove & Replace Inlet Frame & Grate, Remove & Replace ADA ramp & landing (4 ea), Remove & Replace 4” Concrete sidewalk (448 sf), Remove & Replace Concrete Curb (80 lf), 1-1/2” Wearing Course (3637 sy); Andrew Court – Mobilization, Core Samples, Traffic Control, 1-1/2” Milling (1,928 sy), 5” Base Repair (800 sy), Leveling Course (90 tons), Remove & Replace Inlet C Tops (3 ea), Remove & Replace ADA ramp & landing (2 ea), Remove & Replace 4” Concrete sidewalk (224 sf), Remove & Replace Concrete Curb (40 lf), 1-1/2” Wearing Course (1,928 sy).
Skippack Township
Provide snow and ice removal services.
Posted Date
Oct 31, 2025
Due Date
Dec 9, 2025
Release: Oct 31, 2025
Skippack Township
Close: Dec 9, 2025
Provide snow and ice removal services.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Not a viable path here—pivot to COSTARS instead.
Coops: If your offering is on COSTARS, lead with it and ask to purchase via COSTARS.
Entity: Skippack Township, PA.
Status: No evidence of an active sole source pathway or threshold in practice; township relies on competitive bidding.
Board meetings and strategic plans from Skippack Township
The Planning Commission reviewed and accepted the draft of the Skippack Township Comprehensive Plan 2035, which outlines community goals, land use, and infrastructure development. The meeting also included engineering reports covering the award of a contract for the Palmer Park Bocce Court refurbishment, the rejection of bids for the Lenape Park reforestation project, updates on intersection improvements, and planning efforts for future trail and pedestrian connection projects.
The Planning Commission reviewed a land development proposal for 505 Bridge Road involving the construction of fourteen townhouses on a 2-acre site, focusing on traffic, entrance concerns, and emergency vehicle access. The commission also considered a conditional use application and property subdivision for 2031 Cressman Road, which proposes the development of a utility construction headquarters including office space, a garage, and vehicle parking for utility trucks. Staff reports were submitted by the Engineer, Planner, and Manager, followed by the formal adjournment of the meeting.
The Planning Commission granted final land development approval for a 48-unit multi-family condominium project at Biltmore Lot 140 and approved a Conditional Use request for Skippack Meats Farm. Members also voted to support the potential enactment of an ordinance by the Board of Supervisors to regulate the placement and operation of tobacco, smoke, and vape shops. Staff reports included updates on the purchase of a property at the intersection of Rt. 73 and Rt. 113 for planned improvements, the upcoming Bocce Court Improvement Project, and the adoption of the 2035 Comprehensive Plan.
The meeting focused on the review of development plans, including a subdivision proposal at 4080 Creamery Road and a conditional use request for a commercial development at 4388 Skippack Pike. The Planning Commission recommended approval of an ordinance amendment regulating topsoil removal and replacement. Additionally, the meeting included updates on township infrastructure projects, such as roadway improvements, the installation of ADA ramps, the progress of the Charterfield Landing project, the Palmer Park playground installation, and new grant funding for trail improvements.
The board received a grant for road bridge and trail improvement projects, discussed construction manager services, and received progress updates on fire and rental property inspection processes. Public safety reports were provided by local EMS and fire services. Administrative actions included the acceptance of the treasurer's report and the approval of various township bills. Key approvals involved a sewer connection, the scheduling of a conditional use hearing, funding for streambank restoration, and the bid for an ADA ramps project. Additionally, the board passed ordinances and resolutions regarding the recreation board, appointment of a tax collection liaison, and participation in a financial planning program. Several community events, including bike rides and races, were approved along with an annual library donation. Resident safety concerns regarding criminal activity and outdoor music guidelines were also addressed.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Skippack Township's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge