Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Silver Lake Water District
Remove and dispose of cast iron and DI pipe water mains, install 6" and 8" DI pipe water main, remove valves and install gate valves, remove and replace service lines and hydrants, permitting, construction survey and staking, temp traffic control, construction sequencing, temp water pollution and erosion prevention, utility potholing, remove and replace road pavement, pavement planing and asphalt overlay, concrete sidewalk, curb ramp and driveway replacements, adjust utility cover(s), channelization, restore the site including property restoration.
Posted Date
Mar 9, 2026
Due Date
Mar 23, 2026
Release: Mar 9, 2026
Silver Lake Water District
Close: Mar 23, 2026
Remove and dispose of cast iron and DI pipe water mains, install 6" and 8" DI pipe water main, remove valves and install gate valves, remove and replace service lines and hydrants, permitting, construction survey and staking, temp traffic control, construction sequencing, temp water pollution and erosion prevention, utility potholing, remove and replace road pavement, pavement planing and asphalt overlay, concrete sidewalk, curb ramp and driveway replacements, adjust utility cover(s), channelization, restore the site including property restoration.
Silver Lake Water District
Ptoject consists of water improvements including: Approx. 1,340 LF of new 12", approx. 4,060 LF of new 8", and approx. 60 LF of new 6" DI water main; isolation valving; 116 water service connections; 11 fire hydrants; five combination air release/vacuum valve assemblies; 19 connections to existing water main; removal, haul, and disposal of approx. 660 LF of 4", 6", 8", and 10" water main; abandonment of 4", 6", and 8" water main; temp and permanent trench patching; a 2" grind and overlay; channelization; restoration; TESC; and traffic control.
Posted Date
Feb 12, 2026
Due Date
Mar 3, 2026
Release: Feb 12, 2026
Silver Lake Water District
Close: Mar 3, 2026
Ptoject consists of water improvements including: Approx. 1,340 LF of new 12", approx. 4,060 LF of new 8", and approx. 60 LF of new 6" DI water main; isolation valving; 116 water service connections; 11 fire hydrants; five combination air release/vacuum valve assemblies; 19 connections to existing water main; removal, haul, and disposal of approx. 660 LF of 4", 6", 8", and 10" water main; abandonment of 4", 6", and 8" water main; temp and permanent trench patching; a 2" grind and overlay; channelization; restoration; TESC; and traffic control.
Silver Lake Water District
Solicit proposals from software vendors, implementation partners or software resellers who can demonstrate that they possess the organizational, functional, and technical capabilities to provide an enterprise resources planning system that meets the district's needs.
Posted Date
Oct 10, 2025
Due Date
Nov 20, 2025
Release: Oct 10, 2025
Silver Lake Water District
Close: Nov 20, 2025
Solicit proposals from software vendors, implementation partners or software resellers who can demonstrate that they possess the organizational, functional, and technical capabilities to provide an enterprise resources planning system that meets the district's needs.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Silver Lake Water District
The Silver Lake Water & Sewer District's Wastewater Comprehensive Plan outlines a long-term strategy for its sewer utility over a 20-year planning period. The plan focuses on assessing the existing sewer system's condition and capabilities, planning for future service within the defined study area, and determining required system improvements and their associated costs. Key strategic areas include managing potential service expansion in the Cross Valley Water District area, addressing the impacts of annexations by the City of Everett, ensuring compliance with regulatory requirements, and maintaining a high level of service for existing and future customers. It details capital improvement projects, operational programs, and financial strategies to support the District's long-term viability and ensure proper sizing of facilities.
The Silver Lake Water & Sewer District is holding a public hearing to accept public testimony on the proposed adjustments to the rates for water and sewer service. The public is invited to attend in person or via teleconference to address the Board of Commissioners regarding the proposed adjustments. Following the hearing, the Board will consider adopting a resolution to increase the rates for water and sewer services.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Silver Lake Water District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database