Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Shenango Valley Shuttle Service
Soliciting bids for restroom upgrades at the 4h grounds maintenance building - remove existing toilets in restrooms and dispose of. Remove existing sinks in restrooms and dispose of. Paint walls with vapor barrier quality paint. Install point of use hot water heater to supply both restrooms. Install new wall mounted sinks. Install mirrors above sinks. Install shelving unit above both sinks. Make entry doors ada compliant. Install push buttons on inside and outside of doors for access and egress to restrooms. Install new ada doors (must be lockable from inside). Install new toilets. Upgrade plumbing as needed per code. Any new lines need to be of the pex brand; etc, see attached file.
Posted Date
Apr 21, 2026
Due Date
Apr 30, 2026
Release: Apr 21, 2026
Shenango Valley Shuttle Service
Close: Apr 30, 2026
Soliciting bids for restroom upgrades at the 4h grounds maintenance building - remove existing toilets in restrooms and dispose of. Remove existing sinks in restrooms and dispose of. Paint walls with vapor barrier quality paint. Install point of use hot water heater to supply both restrooms. Install new wall mounted sinks. Install mirrors above sinks. Install shelving unit above both sinks. Make entry doors ada compliant. Install push buttons on inside and outside of doors for access and egress to restrooms. Install new ada doors (must be lockable from inside). Install new toilets. Upgrade plumbing as needed per code. Any new lines need to be of the pex brand; etc, see attached file.
Shenango Valley Shuttle Service
Remove existing entryway doors and replace with new ADA preframed doors. Install new polymer partition walls that meet ADA compliancy. a. Women’s restroom 1st stall west partition wall to move 8” to west. b. Men’s restroom toilet partition wall to move to west 6”. c. All partition walls to be shorter in length by 4”. d. Women’s restroom to go from 2 bowl sink to one bowl sink. Remove existing toilets, sinks, urinals, papertowel, and toilet paper dispensers. Install new paper towel dispensers (manual style, non-battery operated). Install new toilets. Install new urinal in men’s restroom. Install new pedestal sinks in both restrooms. Install mirror above sink in both restrooms. Install shelf above mirrors over the sinks for supply storage. Remove existing lights and replace with LED trougher 2' x 4' lights, 2 per restroom. Remove existing light switches and install new switch inside each restroom. Put cover plate on existing switch box when removed. Install new 3 roll toilet paper dispensers (manual style non battery operated). Install new paper towel dispensers (manual style non battery operated). Install new soap dispensers (industrial grade manual style non battery operated). Install industrial grade water filtration system on output of well to remove impurities from well before getting to fill/flush valves. Install new exhaust fans and make operational to operate off of light switch. Paint interior walls of restroom with vapor barrier quality paint. Install signage on doors as to Men or Women restroom. Separate hot water supply off of kitchen feed and add point of use hot water heater to feed both restrooms. Install in women’s restroom and use existing power receptacle. Install "blowout" points on water lines to facilitate closing of building during winter months to allow drainage of water lines. New water feed lines to be of Pex type.
Posted Date
Apr 21, 2026
Due Date
Jul 16, 2026
Release: Apr 21, 2026
Shenango Valley Shuttle Service
Close: Jul 16, 2026
Remove existing entryway doors and replace with new ADA preframed doors. Install new polymer partition walls that meet ADA compliancy. a. Women’s restroom 1st stall west partition wall to move 8” to west. b. Men’s restroom toilet partition wall to move to west 6”. c. All partition walls to be shorter in length by 4”. d. Women’s restroom to go from 2 bowl sink to one bowl sink. Remove existing toilets, sinks, urinals, papertowel, and toilet paper dispensers. Install new paper towel dispensers (manual style, non-battery operated). Install new toilets. Install new urinal in men’s restroom. Install new pedestal sinks in both restrooms. Install mirror above sink in both restrooms. Install shelf above mirrors over the sinks for supply storage. Remove existing lights and replace with LED trougher 2' x 4' lights, 2 per restroom. Remove existing light switches and install new switch inside each restroom. Put cover plate on existing switch box when removed. Install new 3 roll toilet paper dispensers (manual style non battery operated). Install new paper towel dispensers (manual style non battery operated). Install new soap dispensers (industrial grade manual style non battery operated). Install industrial grade water filtration system on output of well to remove impurities from well before getting to fill/flush valves. Install new exhaust fans and make operational to operate off of light switch. Paint interior walls of restroom with vapor barrier quality paint. Install signage on doors as to Men or Women restroom. Separate hot water supply off of kitchen feed and add point of use hot water heater to feed both restrooms. Install in women’s restroom and use existing power receptacle. Install "blowout" points on water lines to facilitate closing of building during winter months to allow drainage of water lines. New water feed lines to be of Pex type.
Shenango Valley Shuttle Service
Seeking proposals from qualified consultant firms to provide planning, preparation, and administration of the countywide housing rehabilitation program.
Posted Date
Apr 21, 2026
Due Date
May 8, 2026
Release: Apr 21, 2026
Shenango Valley Shuttle Service
Close: May 8, 2026
Seeking proposals from qualified consultant firms to provide planning, preparation, and administration of the countywide housing rehabilitation program.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Shenango Valley Shuttle Service
The Transit Development Plan (TDP) is a strategic document outlining the community's vision and plan for improving its public transportation system, specifically the Shenango Valley Shuttle Service (SVSS). The plan involves evaluating current transportation conditions, assessing community needs through engagement, and identifying opportunities for innovation to create a blueprint for short, medium, and long-term transit improvements. Key proposals include optimizing existing routes for efficiency, frequency, and consistency, and introducing a new on-demand 'Shenango Valley Flex' service. Future recommendations are structured in a three-tier approach (improved, enhanced, aspirational conditions) to expand service, extend hours, and establish new regional connections, aiming to create a more efficient, effective, and sustainable transit system that enhances connectivity and supports economic development in Mercer County.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Shenango Valley Shuttle Service's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge