2026 Twin Lakes Drive Recondition RFP
Posted
Oct 2, 2026
Oct 20, 2026
Roadway recondition construction project as follows: •Twin Lakes Drive CTH J to Woodland Road (3.4 miles) •South Twin Lakes Road CTH CC to Twin Lakes Drive (0.7 miles). The Work shall be completed in 50 working days. Items of work include traffic control, pulverize and relay, common excavation, breaker run, geogrid, base aggregate dense 1 ¼-inch, culvert replacements, signing, HMA pavement, base aggregate dense ¾-inch for shouldering, clearing and grubbing, rock boulder removal and landscape restoration. Following is a list of approximate quantities for some of the main items: 2,718 CY Excavation Common; 48,980 SY Pulverize and Relay; 2,475 Tons Base Aggregate Dense 3/4-inch; 23,300 Tons Base Aggregate Dense 1 1/4-inch; 10,335 Tons HMA Pavement.