Old Seabrook Parking Lot Phase 2
Posted
Sep 2, 2026
Sep 22, 2026
Remove existing asphalt pavement and base (all depths), includes all saw-cutting required, including haul-off and disposal, complete in place 32 sy, remove existing storm sewer pipes and structures, includes saw-cutting of pipes, including haul-off and disposal, complete in place 1 ls, remove and dispose of existing water meter and faucet, including capping existing water service line as necessary, complete in place 1 ls, ground stripping and site preparation, including haul-off and disposal, complete in place. See outside link or attached file.