SID No. 554 (Wood Valley) Paving Reconstruction 2026
Aug 5, 2026
Closes
Aug 20, 2026
Work includes approx. 286 LF of crack or joint repair Type A; 190 SY of concrete pavement repair-Large Area(Type OPW 4000); 10 LF of repair curb and gutter;30 CY of unsuitable subgrade material; 70 SY of sodding; 647 LF of jet existing sanitary sewer.