2027 Task Order Contract for Flatwork Street Improvements Package 3 RFP
Aug 12, 2026
Closes
Sep 18, 2026
Include but is not limited to: concrete curbs, sidewalks, driveways, concrete retaining walls-combination type, wheel chair ramps, minor asphalt milling and replacement, removing and relocating mail boxes, topsoil, sodding, striping, elevated sidewalks, sidewalk pipe railing, adjusting existing meter boxes, valve boxes and manholes, tree pruning, removal and/or replacement, and any other items.
