Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Salinas Valley Memorial Healthcare District
Work includes svm cip chiller replacement 200t - replacement of an existing 200-ton centrifugal chiller, cooling tower, and associated mechanical, electrical, and controls systems. Svm cip lab air handler - replacement of an existing air handling unit and associated distribution system components primarily serving the laboratory and other critical care areas. Thermal fluid plant - replacement of existing boilers and thermal fluid heaters with new high-efficiency boiler equipment, associated mechanical, electrical, and control systems; connections to existing heating water, fuel, flue, condensate, and power systems; and construction of a structural bridge to support associated piping.
Posted Date
Jul 17, 2026
Due Date
Aug 12, 2026
Release: Jul 17, 2026
Salinas Valley Memorial Healthcare District
Close: Aug 12, 2026
Work includes svm cip chiller replacement 200t - replacement of an existing 200-ton centrifugal chiller, cooling tower, and associated mechanical, electrical, and controls systems. Svm cip lab air handler - replacement of an existing air handling unit and associated distribution system components primarily serving the laboratory and other critical care areas. Thermal fluid plant - replacement of existing boilers and thermal fluid heaters with new high-efficiency boiler equipment, associated mechanical, electrical, and control systems; connections to existing heating water, fuel, flue, condensate, and power systems; and construction of a structural bridge to support associated piping.
AvailableSalinas Valley Memorial Healthcare District
Provide mri replacement. To meet the increasing demand for high-quality imaging services the project will accommodate the installation of new mri equipment and associated improvements. The work includes and is not limited to: safe-off of existing utilities and associated equipment and systems, provision of temporary power, relocation of existing utilities, and integration with existing utilities. Roof penetrations, floor and wall preparation for new structural attachments, finishes, etc.
Posted Date
Mar 11, 2026
Due Date
Mar 31, 2026
Release: Mar 11, 2026
Salinas Valley Memorial Healthcare District
Close: Mar 31, 2026
Provide mri replacement. To meet the increasing demand for high-quality imaging services the project will accommodate the installation of new mri equipment and associated improvements. The work includes and is not limited to: safe-off of existing utilities and associated equipment and systems, provision of temporary power, relocation of existing utilities, and integration with existing utilities. Roof penetrations, floor and wall preparation for new structural attachments, finishes, etc.
Salinas Valley Memorial Healthcare District
Addition of a backup generator and the modification of the existing server room. The installation of the new backup generator with a sound attenuated enclosure, a new automatic transfer switch (ATS), a new switchboard, new feeders, and tie-in to the existing gas main; demolition of existing transformer, existing panelboard, and existing raceways; addition and modification of housekeeping pads for new equipment; and a new uninterrupted power supply (UPS) to serve the existing server room. Additional server room upgrades include installation of new server equipment, new fully ducted air conditioning units with a refrigerant leak detection system, new rooftop condensing units, and code-required fire alarm system modifications.
Posted Date
Jan 27, 2026
Due Date
Feb 13, 2026
Release: Jan 27, 2026
Salinas Valley Memorial Healthcare District
Close: Feb 13, 2026
Addition of a backup generator and the modification of the existing server room. The installation of the new backup generator with a sound attenuated enclosure, a new automatic transfer switch (ATS), a new switchboard, new feeders, and tie-in to the existing gas main; demolition of existing transformer, existing panelboard, and existing raceways; addition and modification of housekeeping pads for new equipment; and a new uninterrupted power supply (UPS) to serve the existing server room. Additional server room upgrades include installation of new server equipment, new fully ducted air conditioning units with a refrigerant leak detection system, new rooftop condensing units, and code-required fire alarm system modifications.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Salinas Valley Memorial Healthcare District
The Board meeting agenda includes awards and recognition, the approval of various policies and plans, and the settlement of litigation and claims. Reports will be provided by standing and special committees, including Quality and Efficient Practices, Personnel, Pension and Investment, Corporate Compliance and Audit, and Finance. Key items for consideration include the approval of physician recruitment agreements and professional services contracts, the decision not to fund the employees' pension plan for the upcoming fiscal year, cybersecurity consolidation, software agreements, and approval of the operating and capital budget for the next fiscal year. Additionally, the Board will review a resolution regarding the 2026 general election and hold a discussion on supply chain challenges.
The committee discussed several key items, including the recommendation for board approval of cybersecurity consolidation through CDW Government and the renewal of the Microsoft Enterprise Agreement as a sole source contract. Other topics included the Cisco Webex cloud migration, the procurement of RL Datix modules, a construction update, a presentation on the proposed operating and capital budget for the next fiscal year, as well as a financial, statistical, and balanced scorecard review.
The committee meeting focused on several key operational and clinical updates. Discussions included a patient care services update from the Perioperative Clinical Practice Council, which highlighted new initiatives for pre-operative readiness, neurodiverse patient care, and chemo-safety protocols. Quality and safety updates covered sepsis bundle compliance and initiatives, the implementation of the Enhanced Recovery After Surgery (ERAS) program for joint replacements, and a detailed review of the Hospital Readmission Reduction Program across various patient cohorts including AMI, heart failure, COPD, and pneumonia. The Transitional Care department provided reports on readmission rates and ongoing strategies to improve patient outcomes through education and interdisciplinary coordination.
The committee meeting agenda includes a patient care services update with a report from the Perioperative Clinical Practice Council, and various quality and safety updates focused on sepsis protocols, enhanced recovery after surgery initiatives, hospital readmissions, and transitional care. The session also incorporates a closed session for a review of the quality and safety board dashboard.
The committee discussed the recruitment of three physicians, including findings, recruitment agreements, and professional services agreements for each. Additionally, the agenda included a review of investment performance for the 403(b) plan, 457 plan, and employee pension plan, as well as the actuary's pension valuation. Finally, the committee considered a recommendation regarding the funding of the employees' pension plan for the upcoming fiscal year based on the valuation results.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Salinas Valley Memorial Healthcare District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge