Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Sacramento International Airport
Sacramento County Airports/Sacramento International Airport issued a Request for Qualifications seeking a progressive design-build team to plan, design, document, and construct a Consolidated Rental Car Facility at Sacramento International Airport. The project includes full design, regulatory documentation, and construction to deliver an integrated, operational facility consolidating rental car operations. The solicitation is estimated at $180,000,000–$420,000,000 and is open for responses through Aug 13, 2026.
Posted Date
May 29, 2026
Due Date
Aug 13, 2026
Release: May 29, 2026
Sacramento International Airport
Close: Aug 13, 2026
Sacramento County Airports/Sacramento International Airport issued a Request for Qualifications seeking a progressive design-build team to plan, design, document, and construct a Consolidated Rental Car Facility at Sacramento International Airport. The project includes full design, regulatory documentation, and construction to deliver an integrated, operational facility consolidating rental car operations. The solicitation is estimated at $180,000,000–$420,000,000 and is open for responses through Aug 13, 2026.
AvailableSacramento International Airport
Provide on-call architectural, engineering and/or cost estimating services.
Posted Date
May 21, 2026
Due Date
Jul 7, 2026
Release: May 21, 2026
Sacramento International Airport
Close: Jul 7, 2026
Provide on-call architectural, engineering and/or cost estimating services.
AvailableSacramento International Airport
Work includes 4 EA portable changeable message signs; 2,756 SY remove full depth asphalt concrete (ac) pavement; 152 SY remove full depth concrete (pcc) pavement; 100 SY remove existing median (full removal); 1 LS miscellaneous removals; 2 EA removal of pavement marking; 2,739 SY subgrade preparation - scarify and recompact 12 inch; 5,855 tn aggregate base; 945 ton asphalt concrete (type a); 8,086 SF PCC concrete pavement; 20 ton micro-surfacing; 1,813 LF PCC curb (caltrans a1-6); 3,289 SF 6" PCC median; 114 EA install new bollard; 65 LF special delineators; 2,508 LF 6" white stripe (thermoplastic). See outside link.
Posted Date
Jul 31, 2025
Due Date
Sep 4, 2025
Release: Jul 31, 2025
Sacramento International Airport
Close: Sep 4, 2025
Work includes 4 EA portable changeable message signs; 2,756 SY remove full depth asphalt concrete (ac) pavement; 152 SY remove full depth concrete (pcc) pavement; 100 SY remove existing median (full removal); 1 LS miscellaneous removals; 2 EA removal of pavement marking; 2,739 SY subgrade preparation - scarify and recompact 12 inch; 5,855 tn aggregate base; 945 ton asphalt concrete (type a); 8,086 SF PCC concrete pavement; 20 ton micro-surfacing; 1,813 LF PCC curb (caltrans a1-6); 3,289 SF 6" PCC median; 114 EA install new bollard; 65 LF special delineators; 2,508 LF 6" white stripe (thermoplastic). See outside link.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge