Discover Opportunities months before the RFP drops
Learn more →Supply proven microbiological odor-control chemical(s) and optional support services (initial dosing plan, feed-rate adjustments, delivery and SacSewer-escorted tank fill-up, field sampling, troubleshooting, and system optimization) for the S016 pump station wet well and 3,650-ft force main. Three-year contract with two one-year extension options; SacSewer provides two 275‑gallon storage tanks and two injection pumps. Chemical expectation: bacterial concentration >1 billion CFU/mL. Vendor must meet bonding and applicable DIR/labor requirements.
Posted Date
Nov 20, 2025
Due Date
Dec 17, 2025
Release: Nov 20, 2025
Close: Dec 17, 2025
Supply proven microbiological odor-control chemical(s) and optional support services (initial dosing plan, feed-rate adjustments, delivery and SacSewer-escorted tank fill-up, field sampling, troubleshooting, and system optimization) for the S016 pump station wet well and 3,650-ft force main. Three-year contract with two one-year extension options; SacSewer provides two 275‑gallon storage tanks and two injection pumps. Chemical expectation: bacterial concentration >1 billion CFU/mL. Vendor must meet bonding and applicable DIR/labor requirements.
AvailableSacSewer seeks contractors to remove and replace the X09 Outfall electrical switchgear at the EchoWater Resource Recovery Facility: supply, install, and integrate new switchgear compatible with existing Distributed Control System (DCS) transfer controls. Project is a public works construction contract (prevailing wages) with DIR registration required, C-10 Electrical Contractor license, 10% bid bond, and 100% performance and payment bonds; Engineer's estimate $1,500,000; mandatory pre-bid/site visit and standard submittal and insurance requirements apply.
Posted Date
Nov 10, 2025
Due Date
Jan 8, 2026
Release: Nov 10, 2025
Close: Jan 8, 2026
SacSewer seeks contractors to remove and replace the X09 Outfall electrical switchgear at the EchoWater Resource Recovery Facility: supply, install, and integrate new switchgear compatible with existing Distributed Control System (DCS) transfer controls. Project is a public works construction contract (prevailing wages) with DIR registration required, C-10 Electrical Contractor license, 10% bid bond, and 100% performance and payment bonds; Engineer's estimate $1,500,000; mandatory pre-bid/site visit and standard submittal and insurance requirements apply.
AvailableProject scope involves removing the existing switchgear, supplying and installing a new switchgear system, and ensuring compatibility with existing transfer control equipment. This will improve reliability of the electrical infrastructure. Key requirements include compatibility with the upgraded echowater distributed control system (dcs) transfer controls and addressing issues related to maintaining power to critical equipment at the outfall.
Posted Date
Nov 10, 2025
Due Date
Jan 8, 2026
Release: Nov 10, 2025
Close: Jan 8, 2026
Project scope involves removing the existing switchgear, supplying and installing a new switchgear system, and ensuring compatibility with existing transfer control equipment. This will improve reliability of the electrical infrastructure. Key requirements include compatibility with the upgraded echowater distributed control system (dcs) transfer controls and addressing issues related to maintaining power to critical equipment at the outfall.
AvailableMore RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis