Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Sabine River Authority Of Texas
The improvements to the low-level outlet infrastructure at Lake Fork Dam will support continued operations of the facility for making regular water releases from the reservoir storage. The work includes rehabilitation of sluice gates, replacement of gate actuators, repair of outlet pipe protective lining systems, facility access improvements, piping repair, and additional components as shown in the contract drawings and these specifications for a complete project.
Posted Date
May 23, 2026
Due Date
Jun 16, 2026
Release: May 23, 2026
Sabine River Authority Of Texas
Close: Jun 16, 2026
The improvements to the low-level outlet infrastructure at Lake Fork Dam will support continued operations of the facility for making regular water releases from the reservoir storage. The work includes rehabilitation of sluice gates, replacement of gate actuators, repair of outlet pipe protective lining systems, facility access improvements, piping repair, and additional components as shown in the contract drawings and these specifications for a complete project.
AvailableSabine River Authority Of Texas
To provide for the rehabilitation of existing asphalt roads along the embankment of the toledo Bend Reservoir.
Posted Date
Apr 21, 2026
Due Date
May 19, 2026
Release: Apr 21, 2026
Sabine River Authority Of Texas
Close: May 19, 2026
To provide for the rehabilitation of existing asphalt roads along the embankment of the toledo Bend Reservoir.
Sabine River Authority Of Texas
Work is described in general, non-inclusive terms as: Mobilization. Creation and maintenance of staging areas and access points. Placement of owner furnished rock riprap along the upstream slope. Procurement, transport, and placement of rock riprap on the upstream slope. Miscellaneous road repairs. Clean up and demobilization.
Posted Date
Apr 14, 2026
Due Date
Apr 21, 2026
Release: Apr 14, 2026
Sabine River Authority Of Texas
Close: Apr 21, 2026
Work is described in general, non-inclusive terms as: Mobilization. Creation and maintenance of staging areas and access points. Placement of owner furnished rock riprap along the upstream slope. Procurement, transport, and placement of rock riprap on the upstream slope. Miscellaneous road repairs. Clean up and demobilization.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Division Manager, Toledo Bend and Parks & Recreation Divisions
Premium
Access the largest public sector contact database
© 2026 Starbridge