Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
National Center for Education Statistics identifier.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Rudyard Area School
Exterior Brick Replacement.
Posted Date
Feb 5, 2026
Due Date
Feb 25, 2026
Release: Feb 5, 2026
Rudyard Area School
Close: Feb 25, 2026
Exterior Brick Replacement.
AvailableRudyard Area School
Outdoor Concession and restroom facilities - concession stand of 24' by 28' building with a concrete sidewalk of 5' wide around the outside. Exterior lockable doors; shingled roof; wood framed 2" by 6" walls with insulation. See attached file.
Posted Date
Sep 12, 2025
Due Date
Nov 14, 2025
Release: Sep 12, 2025
Rudyard Area School
Close: Nov 14, 2025
Outdoor Concession and restroom facilities - concession stand of 24' by 28' building with a concrete sidewalk of 5' wide around the outside. Exterior lockable doors; shingled roof; wood framed 2" by 6" walls with insulation. See attached file.
Rudyard Area School
Work includes removal of old blacktop and sidewalks and dispose of material on site in area defined by school officials; relining parking spots and drop-off areas as prescribed by the school district; sawcut existing asphalt longitudinally along second street;sawcut each respective building entrance sidewalk;excavate 35' x 804' (including 5' sidewalk parallel to building); place 10' x 20' striped parking stalls along the entire paved strip, six stalls shall be ADA compliant, with two of these having a van unloading area.
Posted Date
Jun 10, 2025
Due Date
Jun 30, 2025
Release: Jun 10, 2025
Rudyard Area School
Close: Jun 30, 2025
Work includes removal of old blacktop and sidewalks and dispose of material on site in area defined by school officials; relining parking spots and drop-off areas as prescribed by the school district; sawcut existing asphalt longitudinally along second street;sawcut each respective building entrance sidewalk;excavate 35' x 804' (including 5' sidewalk parallel to building); place 10' x 20' striped parking stalls along the entire paved strip, six stalls shall be ADA compliant, with two of these having a van unloading area.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Rudyard Area School's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Rudyard Area School's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database