Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes removal of old blacktop and sidewalks and dispose of material on site in area defined by school officials; relining parking spots and drop-off areas as prescribed by the school district; sawcut existing asphalt longitudinally along second street;sawcut each respective building entrance sidewalk;excavate 35' x 804' (including 5' sidewalk parallel to building); place 10' x 20' striped parking stalls along the entire paved strip, six stalls shall be ADA compliant, with two of these having a van unloading area.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide compass academy parking lot construction.
Posted Date
Nov 17, 2025
Due Date
Dec 21, 2025
Release: Nov 17, 2025
Close: Dec 21, 2025
Provide compass academy parking lot construction.
AvailableProvide bus garage - parking lot - gas station that also includes electrical, earthwork, concrete, landscaping, asphalt, gas fueling station, fencing.
Posted Date
Nov 25, 2025
Due Date
Dec 17, 2025
Release: Nov 25, 2025
Close: Dec 17, 2025
Provide bus garage - parking lot - gas station that also includes electrical, earthwork, concrete, landscaping, asphalt, gas fueling station, fencing.
AvailableThis RFP is for Design Services for parking lot improvements to the Strawberry Lot, with an optional bid for the Peach Lot.
Posted Date
-
Due Date
Jan 27, 2026
Close: Jan 27, 2026
This RFP is for Design Services for parking lot improvements to the Strawberry Lot, with an optional bid for the Peach Lot.
AvailableWashburn University is seeking proposals for comprehensive parking lot maintenance and improvements at Washburn Tech North. This project includes 3" milled patching, sealcoating, paint striping, crack filling, and bollard replacement with signage.
Posted Date
Dec 1, 2025
Due Date
Dec 17, 2025
Release: Dec 1, 2025
Close: Dec 17, 2025
Washburn University is seeking proposals for comprehensive parking lot maintenance and improvements at Washburn Tech North. This project includes 3" milled patching, sealcoating, paint striping, crack filling, and bollard replacement with signage.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis