Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Rincon Del Diablo Mun Water Dt
Construct approx. 2,900 LF of District Furnished 16" diameter Ductile Iron Pipe (DIP) water main; relocate existing water main with approx. 260 LF of existing 10" Asbestos Cement Pipe (ACP) with new 8" diameter Polyvinyl Chloride (PVC) pipe water main; install butterfly and gate valves; air vacuum release assemblies; blow off assemblies; fire hydrant assemblies; asphalt concrete pavement restoration; concrete pavement restoration; dispose of piping and fittings.
Posted Date
Mar 17, 2026
Due Date
Apr 21, 2026
Release: Mar 17, 2026
Rincon Del Diablo Mun Water Dt
Close: Apr 21, 2026
Construct approx. 2,900 LF of District Furnished 16" diameter Ductile Iron Pipe (DIP) water main; relocate existing water main with approx. 260 LF of existing 10" Asbestos Cement Pipe (ACP) with new 8" diameter Polyvinyl Chloride (PVC) pipe water main; install butterfly and gate valves; air vacuum release assemblies; blow off assemblies; fire hydrant assemblies; asphalt concrete pavement restoration; concrete pavement restoration; dispose of piping and fittings.
AvailableRincon Del Diablo Mun Water Dt
DESIGN-BUILD services for qualify and select a progressive design-build (PDB) entity to perform phase 1 services for the design and construction of tenant improvements for new administration building. Tenant improvements within approximately 8,000 sq-ft of existing office space and an additional 8,000 SF of new office space, including a board room and elevator, constructed within a portion of the existing warehouse area. See attached files.
Posted Date
Dec 1, 2025
Due Date
Jan 15, 2026
Release: Dec 1, 2025
Rincon Del Diablo Mun Water Dt
Close: Jan 15, 2026
DESIGN-BUILD services for qualify and select a progressive design-build (PDB) entity to perform phase 1 services for the design and construction of tenant improvements for new administration building. Tenant improvements within approximately 8,000 sq-ft of existing office space and an additional 8,000 SF of new office space, including a board room and elevator, constructed within a portion of the existing warehouse area. See attached files.
Rincon Del Diablo Mun Water Dt
The district s goal is to select an executive search firm with the experience and reputation to attract qualified candidates and manage the selection process through the final selection of a candidate to succeed the general manager. The selected firm will work with the board of directors, ad-hoc committee, and staff to define qualification and selection criteria, then create and implement a suitable marketing approach that leads to a successful decision.
Posted Date
Oct 7, 2025
Due Date
Oct 15, 2025
Release: Oct 7, 2025
Rincon Del Diablo Mun Water Dt
Close: Oct 15, 2025
The district s goal is to select an executive search firm with the experience and reputation to attract qualified candidates and manage the selection process through the final selection of a candidate to succeed the general manager. The selected firm will work with the board of directors, ad-hoc committee, and staff to define qualification and selection criteria, then create and implement a suitable marketing approach that leads to a successful decision.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Rincon Del Diablo Mun Water Dt
The Rincon del Diablo Municipal Water District's Urban Water Management Plan is a comprehensive assessment and long-term resource planning document spanning 2025 to 2045. It outlines the District's strategies for ensuring a safe and reliable water supply by analyzing historical and projected water demands, characterizing supply sources, and evaluating water service reliability under various hydrologic conditions, including drought. The plan integrates conservation efforts, demand management measures, and a robust Water Shortage Contingency Plan, while also addressing seismic risk planning and consistency with regional and state water supply strategies, to support long-term service and eligibility for state and federal funding.
The agenda includes an oral report by the Escondido Fire Department regarding current events and community fire readiness relating to Improvement District E (ID-E). An update on District Conservation Programs, Regional Water Supplies, and Statewide Water Resource Outlook will be provided. The General Manager is to be authorized to enter into a Professional Services Agreement with Partners in Public Innovation to perform strategic planning services for the District. An update on Harmony Grove Village Sewer Treatment Plant will be given. The board will discuss the CSDA Southern Area Seat A Board of Directors 2025 Election. There will be a report from the General Manager and Legal Counsel, followed by a closed session to discuss litigation matters.
The special meeting addressed the CY 2025 rates and charges, focusing on the significant revenue gap caused by declining water sales and the impact of external factors driving double-digit rate increases. Key discussion points included balancing financial and system risks, reviewing various alternatives for rate adjustments, and mitigating budget impacts through measures like federal and state grant funding, budget cuts, and staff optimization. The board also considered an upfront payment pilot program to offer member agencies a discount for early payments of fixed charges and discussed the long-range financial planning schedule to ensure transparency and collaboration in rate development.
This strategic plan serves as a forward-looking guide to deliver dependable, innovative, and responsible water services to the community. It is structured around five key priorities: Promoting Fiscal and Resource Health, Prioritizing Safety and Emergency Preparedness, Enhancing Every Department's Customer Service, Strengthening Organizational Capacity, and Ensuring the Reliability and Longevity of Assets and Infrastructure. The plan aims to ensure a secure and sustainable water future and build a more resilient future for San Diego County and its served communities.
The Rincon del Diablo Municipal Water District is proposing adjustments to charges for sewer service in the Harmony Grove Village Sewer Service Area. The adjustments are required to fund the District's sewer enterprise to ensure it continues to safely and reliably provide sewer collection, wastewater treatment, and production of recycled water while meeting all regulatory requirements. The proposed adjustments will fund ongoing operation and maintenance needs, capital improvements, debt service related to a solar energy project, and the establishment of reserves for the sewer enterprise. The District is also incorporating non-customer charge revenue where possible to minimize sewer charge adjustments.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Rincon Del Diablo Mun Water Dt's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database