Expand Fuel Farm RFP
Aug 14, 2026
Closes
Sep 8, 2026
Work includes installation of two proposed fuel tanks to the airport's fbo fuel farm and a proposed concrete pad; bid will consist of installing the avgas tank, skid, concrete pad, and electrical items to provide power to the fuel farm expansion. The proposed avgas tank is to be a 12,000 gallon above ground, double-walled, with fueling racks and dispensers for avgas fuel. A concrete pad will be poured around the perimeter of the tanks. The new tank is being installed adjacent to the existing fuel farm. The existing tanks are approaching the end of their life expectancy: therefore, the new tanks will not be connected to the existing tanks to prevent the possibility of cross contamination should the lining of the old tank start to peel off. The required piping and conduit will be installed to provide power and additional access to the tanks.