Capital Improvement Project Maintenance/Repairs 2027 RFP
Posted
Nov 10, 2026
Dec 1, 2026
The Work includes, but is not limited to, mobilization and demobilization at multiple sites; installing erosion control BMPs in accordance with project SWPPP, including; silt fence, sediment logs, floatation silt curtain, inlet protection, erosion control construction entrances, control of water and/or dewatering as necessary to perform work; using mud mats for protection at access, removal of trees, stumps, vegetation, and debris; excavation/dredging/channel cleaning with off-site disposal to landfill or onsite disposal of sediment/muck/vegetation from stormwater detention ponds, channels, inlet pools, culvert ends; removal and replacement of precast concrete stormwater outlet structures; paver sweeping; replacement of a timber weir system; jetting of underdrain system; berm repair with compacted clay; general site work; control of traffic at and around construction sites, site restoration/seeding with native seed mixes provided by Owner; installing erosion control blanket on all exposed soils.




