Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The county where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Prescott National Forest
This contract is comprised of installing utility lines, connections to existing lines and connections to trailer pads. Utilities included are electrical, water and sewer. Option items included are trenching, providing and spreading gravel and installation of an asphalt apron. Utilities – Water - The new water line will be connected to the existing water line between the meter and bunkhouse. Main water line will remain same size as existing line. Existing line is a 2” poly line. New water line will be a 2” HDPE blue Poly and connect to existing. One stop and waste to be installed within 5ft of new and existing line connection. Sewer – The new sewer line will be connected to the existing sewer line at the bunkhouse. Main line will be 6” with trailer connections being 6” to 3” Wye’s. Drainage must remain between 1/8” – ¼” per ft across the entirety of the line. Must meet state code. Electrical – A transformer and drop-down meter will need to be coordinated and installed with Empire Electric and conduit and wiring ran from meter to the trailer pads. Contractor will be responsible for determining sizing of conduit and wiring. Must meet state code.
Posted Date
Jul 7, 2026
Due Date
Aug 10, 2026
Release: Jul 7, 2026
Prescott National Forest
Close: Aug 10, 2026
This contract is comprised of installing utility lines, connections to existing lines and connections to trailer pads. Utilities included are electrical, water and sewer. Option items included are trenching, providing and spreading gravel and installation of an asphalt apron. Utilities – Water - The new water line will be connected to the existing water line between the meter and bunkhouse. Main water line will remain same size as existing line. Existing line is a 2” poly line. New water line will be a 2” HDPE blue Poly and connect to existing. One stop and waste to be installed within 5ft of new and existing line connection. Sewer – The new sewer line will be connected to the existing sewer line at the bunkhouse. Main line will be 6” with trailer connections being 6” to 3” Wye’s. Drainage must remain between 1/8” – ¼” per ft across the entirety of the line. Must meet state code. Electrical – A transformer and drop-down meter will need to be coordinated and installed with Empire Electric and conduit and wiring ran from meter to the trailer pads. Contractor will be responsible for determining sizing of conduit and wiring. Must meet state code.
AvailablePrescott National Forest
Bear proof dumpsters. 22ea, 4 CUYD.
Posted Date
Jun 10, 2026
Due Date
Jun 22, 2026
Release: Jun 10, 2026
Prescott National Forest
Close: Jun 22, 2026
Bear proof dumpsters. 22ea, 4 CUYD.
Prescott National Forest
A base plus four option year purchase order for a modular office rental.
Posted Date
May 8, 2026
Due Date
May 18, 2026
Release: May 8, 2026
Prescott National Forest
Close: May 18, 2026
A base plus four option year purchase order for a modular office rental.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track vendor wins and renewal opportunities
Prescott National Forest
IGF::OT::IGF FIRE PREVENTION TRAILER GRAPHIC WRAP
Effective Date
Sep 27, 2017
Expires
Effective: Sep 27, 2017
Prescott National Forest
Expires:
IGF::OT::IGF FIRE PREVENTION TRAILER GRAPHIC WRAP
Prescott National Forest
NFES 0120 GATEKEEPER EASY SEALING VINYL FLOORING SYSTEM
Effective Date
May 24, 2017
Expires
Effective: May 24, 2017
Prescott National Forest
Expires:
NFES 0120 GATEKEEPER EASY SEALING VINYL FLOORING SYSTEM
Prescott National Forest
"IGF::OT::IGF" - #5851 E-931 - REPLACE TRANSFER CASE.
Effective Date
Apr 10, 2017
Expires
Effective: Apr 10, 2017
Prescott National Forest
Expires:
"IGF::OT::IGF" - #5851 E-931 - REPLACE TRANSFER CASE.
See expiring contracts, renewal risk, pricing history, and competitor awards — then sync the data to your CRM.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge